Hi,

For a building that has a specific requirements for manufacturing areas to be at temperature/humidity setpoints that fall outside of ASHRAE 55-2004 is there a CIR that anyone else has found that allows you to identify and exclude certain areas for IEQc7.1, yet still achieve this credit?