Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Carpark and definition of GFA

CS-2009 EAc1:Optimize Energy Performance
posted by  Puteri Shireen Jahnkassim  on 

Dear Sir/Madam We are certifying a large retail mall which have a large carpark block ( five levels).

1
Mon Jan 16, 2012, 3:11 pm

Complying with Natural Ventilation Req. in a Apartment Bldg.

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Rob Hink  on 

We have a multi unit high rise residential bldg. and we are attempting to provide natural ventilation to all units using the operable windows and sliding doors.

1
Sat Jan 28, 2012, 8:41 am

E-85 at a gas station?

NC-2009 EAc2:On-Site Renewable Energy
posted by  April Ambrose  on 

We are doing LEED Volume under NC-Retail for a gas station chain that sells E-85 at all locations. Does E-85 qualify as On-Site Renewable Energy?

1
Mon Jan 16, 2012, 3:29 pm

when to use prescriptive vs simulation

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Denise Santini  on 

In what kind of space would you use a prescriptive method for calculating daylight. it seems as it only applies to open office spaces in a small floor plate.

1
Tue Jan 17, 2012, 1:23 pm

Pilot Credit #44 Ergonomics Strategy - wall /work surface ratio

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Cindy Davis  on 

I received a second review comment “Documentation demonstrating that on-site measurements or product data for finishes to demonstrate an average wall-surface-to-work surface illuminance ratio does

0

Low Emitting Furnishings under LEED for Schools 2007

Schools-2009 IEQc4.5:Low-Emitting Materials—Furniture and Furnishings
posted by  Suzanne Allerton  on 

We have used Green Guard For Schools furnishings and have certificates with dates etc.

1
Tue Jan 17, 2012, 3:32 pm

tenant work: fan coils

CS-2009 EAc1:Optimize Energy Performance
posted by  Johannes Gellrich  on 

Hello all, I'm working on a C&S project.

1
Thu Jan 19, 2012, 4:50 pm

LEED NC or HC?

LEED for Healthcare forum
posted by  Lee Dingemans  on 

6,000 sf existing LEED NC V2.2 certified. 3,000 sf (Max) addition The entire existing building and proposed addition is a outpatient healthcare operation. I don’t know if it is licensed or not.

1
Wed Feb 8, 2012, 2:13 pm

Design Operative Temperature & seccondary uses

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Guillermo T. Adamo  on 

Hi, Two questions involving credit IEQ 7.1. 1- In Table IEQc7.1-2 cooling mode: when they ask for the design operative temperature in winter season what do they mean?

0

Daylight Controls for 50% of Lighting Load?

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Simon Ng  on 

Dear all, I am working on a CI Library renovation and we have an existing cellar where the majority of the services exist (IE. Boilers, IT Servers).

1
Sat Feb 11, 2012, 6:05 pm