Modeling PCW Heat Rejection for DES vs. System 5 (DX Cooling)
NC-2009 EAc1:Optimize Energy Performanceposted by Evelyn Dicks, EI, CxA on
I am working on a building that supplies process cooling water (PCW) to lab spaces. The PCW rejects its heat through a heat exchanger to the chilled water system from a district energy plant.
vestibule instead of pressure difference
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Nándor Kovács on
I found in ASHRAE 62.1-2004 standard that using a vestibule to provide airlock between garage and regulary occupied spaces is a compilant way to limit the entry of exhaust gases. Is it possible to
LEED Project Boundary, Existing Irrigation, and Crane Placement
NC-2009 WEc1:Water Efficient Landscapingposted by Brooks Critchfield on
We have a project on an existing campus which requires that two large cranes sit next to the project on an adjacent turf area.
Exhaust Rate of at least 0.5cfm/sq.ft
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on
Hi All, Assuming that one of the hazardous chemical area also has a fresh air supply (in addition to the exhaust), how do we determine if the min exhaust rate (0.5cfm/sq.ft) is achieved.
LEED for Homes - outside the USA ?
posted by Mike Barker on
The usual question from the international market ? How do we rate houses outside continental USA ? Could we make use of a LEED for Home AP who works in the USA ?
ETS - Testing
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by oliver schuster on
Hello, we are currently working on a project and the owner intends to include several smoking rooms for the project.
Extended Stay Hotel
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by S D on
Would an extended stay hotel be considered residential?
75% Whole Building Reuse
Pilot-Credits PC19:Whole Building Reuseposted by Bradley Guy on
Hello Heather, To answer your questions - 1. Yes that is correct this is the total of structural and non-structural assemblies and components as defined by each in MRc 1.1 and 1.3. 2.
EA Prereq 2 - precertification form
CS-2009 EAp2:Minimum Energy Performanceposted by Adam Targowski on
In the precertification form for EA Prereq 2 Minimum Energy Performance after selection of the appropriate compliance path (which in my case is Whole building energy simulation) there is another se
Task Lighting
Schools-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear all, I received the following review comment for my school project: "Tables EAp2.4 and EAp2.5 report consumptions for process lighting for both cases, but it is unclear what lighting has bee