Forum quick links
Re: Facility Alterations and Additions
posted by David Posada on
Your observation that the displacement of occupants would be minimal and the work is limited to just carpet replacement would suggest this meets the intent of an "alteration" even if it is technica
Re: LEED NC versus LEED for Homes for Temporary Lodging Faciliti
posted by David Posada on
You may find LEED Homes is a better fit - it's being used more and more for low and mid-rise apartment buildings.
PI f3: Full-Time Equivalence and Total Daily Occupancy
posted by Daniela Aguilera on
I'm working on a core and shell certification proyect, especifically filling out the PI form -3, i don't know which option i need to select in order to achieve this prerequisite because, first of a
Does it matter where to install occupancy sensors
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Steve Khouw on
To earn this credit for Strategy 3, does it matter where we locate the sensors so long as we meet the minimum 75% connected light loads, right?
stay-in-place formwork
Schools-2009 MRc5:Regional Materialsposted by Alicja Bieszyńska on
Shall I included in calculation for Regional materials stay-in-place formwork ?
Exterior Lighting Power Allowances
NC-2009 EAp2:Minimum Energy Performanceposted by Omer Moltay on
We are struggling with some definitions from Table 9.4.5 of 90.1-2007.
Discounted Parking Rate for Higher Education Facility
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Miranda Gardiner on
Has anyone been awarded/successfully applied Option 1 for a Schools project, using the Discounted Parking Rate?
FTE Calculations & Application
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Austin Evans on
I'm having a hard time understanding what I should actually use here to put in the online forms for FTE.
Energy simulation
CS-2009 EAc1:Optimize Energy Performanceposted by Redy Truccolo on
Hi, I'm running an energy simulation on a three floors office building. This building have also an entrance hall. The HVAC system for the office part is a VRV Fan Coil System with external air con
Sustainable Purchasing
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Jessica Bruscato on
I am interested in pursuing LEED EBOM certification for an existing convention center.