Forum quick links
Phase I for an Existing School
Schools-2009 SSp2:Environmental Site Assessmentposted by John McFarland on
Do we need a formal Phase I assessment for a school remodeling project (major renovation)? The school site was a greenfield site when it was originally constructed approximately 50 years ago.
Compliance if there are no fixtures on the design
CS-2009 WEc3:Water Use Reductionposted by Jose Salinas on
Hi, The Owner is constructing a tower with high end tenants on the his scope.
Cost of Renewable Energy
NC-2009 EAc1:Optimize Energy Performanceposted by Gregg Achtenhagen on
I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.
Preferred Parking special parking lots
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Markus Henning on
In our new project we provide 65 parking lots. To achieve the credit requirements we must provide 4 parking lots for low emitting vehicles. We provide 3 special parking lots for SMART cars.
D&C credit designations
posted by Tristan Roberts on
To see which credits are Design and which are Construction, go to the individual LEED certification credit pages on LEEDuser, click on the "Documentation Toolkit" tab, a
Can a restaurant achieve this credit?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Wendy Shindledecker on
I'm starting a new project on a bar and grill this is seeking LEED silver. I'm a little confused on how a restaurant would achieve this credit.
LEED NC & CS v3.0 Quarterly addenda
CS-2009 WEp1:Water Use Reductionposted by Adriana Hansen on
The latest version of LEED NC & CS v3.0 Addenda incorporates changes and improvements to LEED 2009 resources. However there are some considerations that were not clear.
IEQc7.1
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Robert Shapero on
Tristan, Is it possible to show a sample calc for credit 7.1. I am not sure how to calculate this and would welcome any insights as to how about providing this calculation.
Re: Documentation Time for Credits
posted by David Posada on
I've not seen a breakdown by credit, as it can vary widely by the strategy pursued and experience of the team, but there's a related discussion of this question over at http://www.leeduser.com/topi
SSc1 Path 4 Heat Island Effect- Nonroof
CI-2009 SSc1:Site Selectionposted by Michelle Bracewell-Musson on
To clarify: 1.) Can I use a combination of underground parking stalls AND light colored pavement (SRI - 35 typical new gray concrete) AND landscape (tree) shading to achieve this point?