Forum quick links
Exemplary Performance documentation
NC-2009 IDc1:Innovation in Designposted by Ned Halling on
After filling out a credit form online, the summary section has a 'Y' after exemplary performance points documented line.
scope of eligible foods and beverages
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Amanda Redmond-Neal on
Most of the organizations in my building purchase only the standard office fare by way of foods: coffee, juices, maybe some popcorn.
Central Plant Question
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lauren Sparandara on
Scenario: Campus new construction projects which are connecting to an existing central plant for heating and cooling.
ETS control in a Casino???
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Juan Robles on
I am evaluating a hospitality project which includes a casino.
Owner as required signatory
Schools-2009 IEQc7.2:Thermal Comfort—Verificationposted by Kathleen Lawson on
Was the Owner the required signatory in Schools 2007?
Prescriptive Method: skylight zones?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Kash Boodjeh on
Hello, We are pursuing the Prescriptive Method for this credit, using both skylights and windows.
ID Catalog and precendence
Schools-2009 IDc1:Innovation in Designposted by Lisa Logan on
Below is a response I received from a reviewer concerning a credit I took directly from the ID catalog which indicated that the credit along with supporting documents was acceptable.
Increase Ventilation - Corridor
CI-2009 IEQc2:Increased Ventlilationposted by Simon Sue on
Hi, we intend to attempt this credit, but come across on our design that we does not have any dedicated FCU serving on this corridor.
Building Height to Street Width Ratio Issues
posted by Shenhao Li on
NPD P1 Walkable Street requires at least 15% of existing and new street frontage within and bordering the project has a minimum "building-height-to-street-width ratio" of 1:3. Can anybody explain
LEED-CI EAc3
CI-2009 EAc3:Measurement and Verificationposted by Tapio Peltonen on
LEED-CI 2009 EAc3 Case 1 Online form has options for sub-metering or central plant. Does the central plant mean that the tenant space is served by e.g.