Forum quick links
Guadua
NC-2009 MRc6:Rapidly Renewable Materialsposted by Carlos Alberto Hoyos Soto on
I want to know if anyone has use guadua, and if it is considered as rapidly renewable material, thanks.
DES Commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Margaret Montgomery on
We're looking at a project where we do meet all the conditions for enhanced commissioning that would indicate we need to commission the district energy plant (third party, local CHP plant), but we'
Maximum Points Available
EBOM-2009 EAc1:Optimize Energy Performanceposted by David Hubka on
The LEED O&M reference guide states that two points are available under EA Credit #1 for projects that follow Case 2 Option 2A however the LEED online template does not award credits under this
LEED Online Language
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Simon Sue on
The credit intent and application is very clear as stated above: "Private offices and open space offices need multiple controls for 50% of occupants.
Floor area calculation
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Lorely Gonzalez on
What is "bay depth to core"???
Applying both Case 1 and Case 2 to our site?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Shannon Terrell on
We have a site that is partially a greenfield and partially previously developed (remediated brownfield).
Please Clarify
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Aliesa Adelman on
Two different bus lines simply refers to two buses on different routes from the same carrier, correct? Or does the credit require two separate carriers servicing stops 1/4 mi. from the project?
South America weather data
NC-2009 EAc1:Optimize Energy Performanceposted by Carlos Alberto Hoyos Soto on
Anyone knows what energy modeling software has developed South America weather data?
CFC-Based Refrigerant Annual Leakage Rate
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Jason McIntyre on
I'm hoping for some insight on the annual leakage rate calculation, the reference guides reference to EPA Clean Air Act, Rule 608, and the Refrigerant Management Plan. On page 145 of the reference
Modelling Condenser Efficieny in Baseline for LEED
NC-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
We are modelling a building with water cooled chillers. We are preparing a baseline plant for LEED NC 2009. For the check of necessary plant efficiencies we checked the minimal efficiencies with co