PIf4-mechanical schedule

General forums
posted by  Tarek Dalati  on 

what is meant pi L3-mechanical schedule. where can i find filled project information forms(1-4) regards, tarek

1
Tue Mar 8, 2011, 1:39 pm

Appeal documentation

General forums
posted by  Susann Geithner  on 

We submitted two appeals last year for EA P2 and meet the GBCI on the Green-built to discuss the appeal process. They were very helpful and understanding.

0

maintaining LEED certification

General forums
posted by  Tristan Roberts  on 

Pinky, if you're talking about LEED-NC v2.2, this is not a question of maintaining your certification. Once awarded, only the LEED-EBOM certifiation needs to be maintained.

1
Tue Mar 8, 2011, 5:53 pm

LEED Certifications for Multiple Buildings

LEED Guidance for Campuses and Multiple Buildings
posted by  Keerthi Ratnayake  on 

We have two buildings to be certified; one new and one existing. What are the requirements for these to be evaluated as one building for the LEED certifications? HVAC chillers etc.

1
Wed Mar 9, 2011, 2:15 pm

Reused Metal Shelving

CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishings
posted by  James Shook  on 

We have a library renovation project that is reusing the existing shelving in the space instead of purchasing new.

1
Wed Mar 9, 2011, 11:46 pm

Baseline Building Envelope requirements

NC-2009 EAc1:Optimize Energy Performance
posted by  alberto carlesi  on 

Hi, I'm modeling a building (not residential),for EAc1, located in climate zone 6 (winter design temperature 5°F).

1
Wed Mar 9, 2011, 7:32 pm

Base Building for a mixed use project

NC-2009 EAc1:Optimize Energy Performance
posted by  Graciela Carrillo  on 

We have a project that is a mix-used 23,000 SF bldg. The lower story is commercial (8,000 SF) and 2-stories of residential (15,000 SF).

1
Thu Mar 10, 2011, 7:02 pm

Graphic Ink

CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Grace Ming  on 

Hello all, One of our CI project will be using the blinds with Graphic prints. My question is if the ink needs to comply with any of IEQ requirements? Any guidance would be greatly appreciated.

1
Thu Mar 10, 2011, 1:23 pm

Determining compliance

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Tiago e Silva  on 

I’m working on a Project in Portugal, which consists in a 13.400m2 site, with 6000m2 rooftop (harvests rain), 2500m2 green roof, 2735m2 of gardens, 306 m2 of planters and 1840m2 of impermeable pave

1
Tue Mar 29, 2011, 9:07 pm

Suggestions for Calculating Casegood area

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  James Shook  on 

We have a library project that is reusing metal shelving. Since it is being used for the same purpose this credit indicates it should be part of MR1.2.

1
Tue Mar 29, 2011, 1:53 pm