EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Xun Jia on
Do spaces that are not regularly cleaned such as mechanical rooms and tenant storage rooms need to be counted as the 10% exempted?
EAp2, Option 2
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by susan eguia on
Hi, I've got the offline calculator for EAp2. Once completed the eligibility requirements do we still need to input at Energy Star Portfolio tool?
More multiple buildings!
posted by Jeremy Knoll on
I'm working on the first project of a 10 year masterplan, each component of which is required to be LEED Silver or better.
Airport jetway re-use
CI-2009 MRc3.1:Materials Reuseposted by Raphael Sperry on
We have an unusual case in an airport project I am working on. It is LEED-CI as we are refurbishing a passenger concourse and some of the back-of-house spaces that go with it.
Cleaning contract for roll out mats
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by V. Miller on
LEED User credit checklists for this credit indicate that a copy of the cleaning contract must be provided.
Modeling Future Chillers
NC-2009 EAc1:Optimize Energy Performanceposted by Tom Nichols on
We are modeling and commissioning a dormitory building where 4 pipe vertical fan coils have been installed.
Monitoring in a multi residential complex
NC-2009 EAc5:Measurement and Verificationposted by lance mccardle on
How is this credit addressed in a multi residential complex (77 student apartments) where tenants pay their own energy bills?
EAPr2 - Lighting Control mandatory in Ashrae standard
CI-2009 EAp2:Minimum Energy Performanceposted by Ramesh Narayanan on
Ashrae 9.4.1 Lighting control states that "Buildings larger than 5000 square feet must have an automatic control device to shut off all lighting in the building.
LEED AP
CI-2009 IDc2:LEED Accredited Professionalposted by Michelle Bracewell-Musson on
While researching the Team Members for LEED AP certification, I noticed under mine (I am a LEED AP) that it said my certificate was not uploaded and that I was not an AP. How do I update this?
LEED AP
CI-2009 IDc2:LEED Accredited Professionalposted by Michelle Bracewell-Musson on
I understand that I need to upload somewhere. Do I do it on the GBCI and USGBC general membership or is there a particular area I need to go to on my project?