Forum quick links
ASTM E1903-97 Phase II Environmental Site Assessment - Local Equivalent documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Adrie Fourie on
We are involved with a project outside of the US that undertook a site assessment as part of a legal requirement to decommission a filling station previously operated on site.
Use High Priority Site as Innovation
CS-v4 LTc3:High priority siteposted by Sara Johansson on
Hello, I have a CS v.2009 project and wish to use the High Priority v.4 credit as an innovation credit.
Sub-metering
NC-v4 EAc3:Advanced energy meteringposted by Ricardo Sá on
According to the LEED Credit EA Advanced Energy Metering it is mandatory to “install advanced energy metering for… any individual energy end uses that represent 10% or more of the tota
Interior Cross Contamination Prevention
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
LEED EQ Credit Enhanced Indoor Air Quality Strategies requires, for mechanical ventilated spaces (OPTION 1), interior cross contamination prevention, i.e., to “sufficiently ex
Greywater reused for technical washings
NC-v4 WEc2:Indoor water use reductionposted by Ricardo Sá on
We are involved in the LEED certification of a building that will be used by a gardening company.
EQ credit 2- Low emiting materials.
CI-v4 EQc2:Low emitting materialsposted by Tracy Backus on
EQ Credit 2: Low-emitting materials Furniture evaluation.
Only bowls and castles need apply?
NC-v4 SSc4:Rainwater managementposted by Daniel Hartsig on
Full disclosure: I'm not a civil engineer but I have to try to explain the LEED requirements too them.
Subfloor Product
NC-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
We have a subfloor product that does not have an emissions certification but does meet VOC requirements.
Store and Electrical Rooms Minimum FA
NC-2009 IEQp1:Minimum IAQ Performanceposted by Khaled Hamaideh on
For store rooms, electrical rooms and IT rooms which are unoccupied spaces and relatively small (around 10 m2); required Fresh Air as per Table 6-1 of ASHRAE 62.1 2007 is less than 10 l/s.