Forum quick links
Permanent entrywway systems - rollout mats?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Keith Robertson on
The reference guide includes rollout mats in the list of "acceptable permanent entryway systems." LEED 2009 allowed rollout mats to be used as part of the 10' but treated it as non-permanent.
Semi-Heated Space, fan volume & fan power must be modeled identically in baseline and proposed.
NC-2009 EAp2:Minimum Energy Performanceposted by Dave Hubka on
Hello,
We received a review comment that states "the fan volume and fan power should be modeled identically in the proposed and baseline for semi-heated spaces".
School as a Teaching Tool French Learning Lab??
Schools-NC-v4 INc1:Innovationposted by Leanne Conrad on
I am working with a Francophone school in Canada who wish to pursue the School as a Teaching Tool innovation credit.
ASHRAE 90.1-2010 - Unmet hours
CS-v4 EAp2:Minimum energy performanceposted by Giuseppina Amorusi on
Hi all,
I’m modeling for a project under LEED CS v4 according to ASHRAE 90.1-2010.
I know that unmet hours shall not exceed 300 .
Proving compliance with other 3rd party tests
NC-v4 EQc2:Low emitting materialsposted by F. Borja López Calle on
Hello,
Lighting control in prison cells
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sananda Mukherjee on
There are 3 levels of lighting that the lighting can adjust to within the prison cells in a jail but the inmates will not have the capability to control their own lighting, the controls w
Private / Public Fixtures for Outpatients
Healthcare-v2009 WEp1:Water use reductionposted by CT G on
We are working on a clinic which was both inpatients and outpatients.
Zero Construction Waste Report
posted by Emily Naud on
Hi All,
I just tried to post a minute ago but it said my connection was lost, so I'm starting over again. You may see two similar posts from me.