Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

water consumption calculations for Irrigation

CS-2009 WEc1:Water Efficient Landscaping
posted by  Selvarasu M  on 

Hi,

The following are the queries with respect to irrigation calculations:

0

Campus submission for review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Philippa Cameron  on 

Hi. We have a campus Master Site that we believe is ready for design review submission. We have completed all forms for the targeted credits and added all documents to LEED online.

1
Fri Mar 9, 2018, 7:35 pm

Indoor Rubberized (durable) Sports Flooring?

Green Commons
posted by  Amber Richane  on 

Hello lovely Green Gurus. Hope you all are well. I am wondering if anyone has installed an indoor sports floor that performed well and is low-emitting.

4
Partner, Sustainability Director
WRNS Studio
LEEDuser Basic Member
0 thumbs up
Tue Mar 6, 2018, 4:03 pm

Innovative Approaches to Construction Waste

SC Leaders
posted by  Steven Burke  on 

To piggyback off Nathan's introduction where he mentions construction waste management, who is doing anything innovative or different in managing construction waste?  Construction waste has no

10
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Tue Mar 6, 2018, 1:26 pm

Interior Lighting Controls - Daylighting Controls

CI-v4 EAc2:Optimize energy performance
posted by  Michael Archer  on 

The credit states the following: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of

1
Wed Mar 7, 2018, 11:08 pm

Demolition includes Mechanical and Electrical equipment

NC-v4 MRc5:Construction and demolition waste management
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded.

1
Tue Mar 6, 2018, 3:16 pm

ventilation chimneys for buffer space

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

The corridors are separated from the staircase by two doors in order to create a space (buffer space) whose walls and doors are fire-resistant.

3
Mon Mar 5, 2018, 8:38 pm

Calculating F.T.E. for a police substation

NC-2009 PIf3:Occupant and Usage Data
posted by  Joe Malone  on 

We are working on a police substation that houses two precincts with three shifts per precinct.

1
Mon Mar 5, 2018, 10:34 pm