Forum quick links
How to submit credit for multiple buildings
NC-2009 WEp1:Water use reductionposted by Edgar Arevalo on
We're trying to work on WEp1 prerequisite for two buildings located in our LEED group project. On the LEED Online for one of the builings I'm working on, it says to complete a separate form f
Ergonomic Standards
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Brenda Parker on
Is there a website to view the ergonomic standards for workstations (BIFMA G1-2013, ANSI/HFES 100-2007, CSA Z412-00, ISO 9241-5:1998) without paying a fee?
Indoor Air Quality Procedure
NC-v4 EQp1:Minimum indoor air quality performanceposted by James Keohane on
I understand that the credit language requires the use of the Ventilation Rate Procedure(VRP) from ASHRAE 62.1-2010.
Independent Living Units NOT Included??
NC-v4 EQc5:Thermal comfortposted by James Keohane on
Project Information: A LEED V4 New Construction project consisting of a three story clubhouse with Independent Living units on the upper four floors. The Cluhouse elements account for 6
Baseline HVAC system for existing building
NC-v4 EAp2:Minimum energy performanceposted by Ying Lindsey on
Dear All,
LEED Boundary with Main Building, Parking Garage & Parksmart
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ralph Bicknese on
We have a new 609,000 sf building seeking LEED BD+C v4 certification. A new 1800 space parking garage will be built design-build as part of the project but by separate designer, same CM.
Lead-free paint
Healthcare-v4 MRc6:PBT source reduction - lead, cadmium and copperposted by Mark Meaders on
I was looking to see if there is a threshold that states the amount of lead in paint that is considered lead-free (something along the lines of what is stated for pipes or flux).
25% Threshold?
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Douglas Flandro on
In the LEEDUser's take on this credit there is a sentence that says, "There is no minimum threshold of recycled content
Rooftop Pool
NC-v4 SSc5:Heat island reductionposted by Danielle Waters on
If a residential project with a rooftop pool wants to pursue SSc5-Option 1, but how does the pool full of water impact the calculations? Is the pool sq.ft.
EQpc117: Quality views in nonregularly occupied spaces.
NC-v4 INc1:Innovationposted by Marie Bizzak on
We are working on a project that is already getting an exemplary credit for quality views. Is it possible to get this exemplary credit in addition to the pilot credit?