Forum quick links
LEED Charrette
Healthcare-v4 IPp1:Integrated project planning and designposted by Molly Jones on
Has anyone successfully conducted the half day charrette in segments (2 days @ 2 hours each)?
Documenting Minimum IAQ performance of C&S warehouse and Distribution facilities
CS-v4 EQp1:Minimum indoor air quality performanceposted by Lawrence Rennell on
LEED 2009 had a button to click to indicate that all mechanical installations would be covered by the Tenant Lease and Sales Agrrement.
Synergies
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Kath Williams on
This pilot credit enabled the project team to "think beyond" siting, conventional building materials, landscape, cultural inclusion and education. The project is called American Indian H
MR credits- which divisions?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by LUCY WILLIAMS on
The previous versions of LEED limited the MR credits to Divisions 2 through 10 and 12. It excluded MEP materials.
Exception for Constant Volume HVAC system in ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Joel Rothenberg on
Hello All,
Baseline Energy Source for Electric only Building energypro
NC-v4 EAp2:Minimum energy performanceposted by Mike Magee on
A bit of a newbie to LEED stuff, but does anyone know how to make the baseline energy source electric in stead of gas?
Group Project Scoring
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Andy Rhoades on
How do I score EAc7 when certifying for a group project? I have the VER proposals for the three buildings but don't know how to score them together. Thanks!
Remediation of LEED Project Area or only disturbed areas
NC-v4 LTc3:High priority siteposted by Mark Meaders on
We have a project that has had a Phase 1 and II ESA performed. It found there was acetone and mercury on site.
EV Charging Stations
NC-v4 LTc8:Green vehiclesposted by Dianne Herrin on
Hello - My client is preparing to purchase Tesla EV charging stations to meet LEED v4 requirements. These stations will work only with Teslas.