LEED Charrette

Healthcare-v4 IPp1:Integrated project planning and design
posted by  Molly Jones  on 

Has anyone successfully conducted the half day charrette in segments (2 days @ 2 hours each)?

 

2
Thu Jul 8, 2021, 5:51 am

Documenting Minimum IAQ performance of C&S warehouse and Distribution facilities

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Lawrence Rennell  on 

LEED 2009 had a button to click to indicate that all mechanical installations would be covered by the Tenant Lease and Sales Agrrement.

1
Thu Jul 8, 2021, 4:28 am

Synergies

Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environment
posted by  Kath Williams  on 

This pilot credit enabled the project team to "think beyond" siting, conventional building materials, landscape, cultural inclusion and education.  The project is called American Indian H

0

MR credits- which divisions?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  LUCY WILLIAMS  on 

The previous versions of LEED limited the MR credits to Divisions 2 through 10 and 12. It excluded MEP materials.

9
Wed Jun 30, 2021, 8:51 am

Baseline Energy Source for Electric only Building energypro

NC-v4 EAp2:Minimum energy performance
posted by  Mike Magee  on 

A bit of a newbie to LEED stuff, but does anyone know how to make the baseline energy source electric in stead of gas?

 

1
Fri Jul 9, 2021, 5:37 pm

Group Project Scoring

EBOM-v4 EAc7:Renewable energy and carbon offsets
posted by  Andy Rhoades  on 

How do I score EAc7 when certifying for a group project? I have the VER proposals for the three buildings but don't know how to score them together. Thanks!

 

0

Remediation of LEED Project Area or only disturbed areas

NC-v4 LTc3:High priority site
posted by  Mark Meaders  on 

We have a project that has had a Phase 1 and II ESA performed. It found there was acetone and mercury on site.

1
Fri Jun 18, 2021, 2:07 pm

EV Charging Stations

NC-v4 LTc8:Green vehicles
posted by  Dianne Herrin  on 

Hello - My client is preparing to purchase Tesla EV charging stations to meet LEED v4 requirements. These stations will work only with Teslas.

3
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Wed Jun 16, 2021, 4:55 pm