LEED v4.1 If all products in one category comply with the VOC emissions evaluation do we need to list the cost or surface area?
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
We are having a tough time getting the costs from our subs. The subs says that the cost is bundled with other material and they can't break it up.
Daylight Study - Approach for partial wall coverings / multiple materials
CI-v4.1 EQc7:Daylightposted by Yarden Harari on
Hi All,
Has anyone come across a project that has multiple treatments on a wall (like an acoustic band), or multiple flooring finishes that are similar in shade / reflectance values?
Low Construction Waste Diversion Rate
NC-v4 MRp2:Construction and demolition waste management planningposted by Jason Cocek on
I have a project located in an area without access to good construction waste recycling services and the best option is to haul waste more than two hours away from the site.
"external" process energy for airports - jet bridges, ground power units, andpreconditioned air units
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hello,
Table 7.8 DHW performance requirements for electric instantaneous water heater
NC-v4 EAc2:Optimize energy performanceposted by on
I see there is "Gas Instantaneous Water Heaters" in Table 7.8, but there is not an "Electric Instantaneous Water Heater" in the table. Is the "Electric Water Heaters" term meant to be generic
Piping Insulation
NC-v4 EQc2:Low emitting materialsposted by Megan White on
For new construction projects, the Ref Guide excludes insulation around HVAC ducts from the IEQc2 requirements (p.668).
Demand Response for Residential buildings
NC-v4 EAc4:Demand responseposted by Amanda Cunningham on
Has anyone pursued this credit for a multifamily building? I'm assuming the automated demand response would only apply to common areas under the building management's control.
EA Credit: Enhanced Commissioning
CI-v4 EAc1:Enhanced commissioningposted by Lawrence Rennell on
What level of testing is actually required for LEED V4 enhanced commissioning envelope testing?
Diverse approaches
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Kath Williams on
This is our fourth project to attempt this credit. A major "lesson learned" is to make sure the intent and requirements are discussed early in concept and SD. This can be an immense hel