TAB Report and Calculations
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Tom Liebel on
We have just received a request for additional clarification during our final review of our LEED-EBOM 2009 submission, asking us to confirm the date of our TAB report, and pointing us to the the Ca
LEED Online v4 for Multiple Buildings on a Campus
posted by Deborah Lucking on
LEED Online v4 was a surprise in more ways than one. The individual projects are now certified under the Master Site, which is certified under the Campus (the old "block"). All well and good.
How does LEED SSc6.1 calculate "Imperviousness"?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Brian O'Mara on
How does LEED SSc6.1 calculate "Imperviousness"?
WaterSense Labeled Products
NC-v4 WEp2:Indoor water use reductionposted by Rick Ellison on
Reference Guide indicates WaterSense label requirements are mandatory in U.S. Right now the program for the WaterSense label on toilet flushometers is still in draft stage.
Help w/ wrangling RECs.
CS-2009 EAc2:On-site Renewable Energyposted by Brian Salazar on
Preface: LEED CS v3.0 Project in Massachusetts. Our project is designed to produce 16% on-site renewable energy. The energy is fed directly into the building and used by the building.
Questions about High-rise residential LEED Energy Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Tommy Xing on
Hi, I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting.
Compliant area
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by David Browne on
Perhaps this a dumb question, but would someone please clarify this for me? I am currently attempting this credit on two projects.
HVAC system wasn't running during construction
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Juanita Garcia on
If the HVAC system wasn't running during construction of a new building, what is the requirement for documentation? We have dated checklists documenting that the HVAC system wasn't running and that
Exterior Shading Devices
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Sara Zoumbaris on
Hello LEED Users, I am working on a project with a majority of the exterior being composed of aluminum curtain wall.
Is the credit for during construction, or after envelope is up?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Nelina Loiselle on
We have an issue with a General Contractor on a project.