Appeal for additional credits after final review.

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Zane Lichtneger  on 

The Standard Preliminary Review is complete and the building has received 57 points. My question is- Can we submit for additional points not included in the initial submission?

8
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Sep 22, 2015, 5:24 pm

Rounding of Percent Energy Cost Savings for EAc1 Points

NC-2009 EAc1:Optimize energy performance
posted by  Joseph Chappell  on 

Hi all, We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%.

11
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Sep 14, 2015, 2:04 pm

Construction credit review v2009

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Deborah Locklair  on 

I just inherited a project after the initial design (already approved) and initial construction credits were submitted.

2
Mon Sep 14, 2015, 11:40 am

Process Energy Savings - Exceptional Calculation - Dry Coolers

NC-2009 EAc1:Optimize energy performance
posted by  MYRON JORDAN  on 

My inquiry is based upon reducing the energy consumption of a chilled water system which is being used in a manufacturing facility.

3
Thu Sep 3, 2015, 6:30 pm

Defining Boundary for Energy Performance

NC-2009 EAp2:Minimum energy performance
posted by  Ralph Bicknese  on 

For a renovation and addition to an existing college campus library, we are in the process of determining the boundary to use for energy performance. The existing building is 182,738 SF.

3
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Wed Sep 2, 2015, 3:22 pm

MRc4 vs MRc7

Healthcare-v4 MRc7:Furniture and medical furnishings
posted by  John Long  on 

We are an FSC-certified (brand new) casework manufacturer. We are submitting our very first FSC job. This job is also a LEED project.

3
Tue Sep 1, 2015, 6:01 pm

LEED-NC or LEED for Homes (and v3 vs v4)?

LEED Rating System Selection
posted by  emily reese moody  on 

Hello, I've tried calling USGBC, who told me to email [email protected]. I did that a little over 2 weeks ago, and have yet to get a response.

6
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Mon Aug 31, 2015, 1:39 pm

DES for a combination of rated and non-rated building

NC-2009 EAp2:Minimum energy performance
posted by  Bradley Felts  on 

I have a project that will be conditioned by a water-cooled chiller and boiler plant located in one of the building that will be rated.

5
Default Avatar
Atlantec Engineers
LEEDuser Basic Member
0 thumbs up
Wed Aug 26, 2015, 7:44 pm

Walk-Off on exterior and interior

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Aaron Levine  on 

An earlier comment said that, "LEED Interpretation #10098 seems to be saying that, if your entry system is at the exterior &/or less than 10 feet long, you will need to write a darned good just

8
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Aug 20, 2015, 2:19 am

Extent of Documentation

NC-2009 IEQc8.2:Daylight and views - views
posted by  David Browne  on 

I know from having attempted this credit on other projects that the documentation can be tedious, but I have a current project where it seems ridiculous.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Aug 14, 2015, 3:40 pm