Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

new floor in existing building envelope

NC-2009 PIf2:Project Summary Details
posted by  KIMBERLY KRAFT  on 

Hello LEEDUsers, We are submitting a project for LEED NC v.2009 - major renovation and new construction.

2
Default Avatar
Principal
In Balance Green Consulting
LEEDuser Premium Member
0 thumbs up
Sat Nov 21, 2015, 4:24 pm

AP Certification on v2009

CI-2009 IDc2:LEED Accredited Professional
posted by  Paul Duva  on 

I am working on a v2009 LEED project and am the currently the LEED AP on the project for our IDc2 credit. I originally had a LEED AP & a LEED BD+C, however my BD+C has expired.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Nov 16, 2015, 11:27 pm

Dorm Suite Ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  BAOQUY VU  on 

Our project is a large high rise dorm consisting of 4-person suites arranged typically as a 2BR and two 1BR's connected by a short inner hallway.

2
Sat Nov 7, 2015, 2:08 am

Modeling additions and alterations

NC-2009 EAp2:Minimum Energy Performance
posted by  Cory Duggin  on 

Table G3.1 section 2 a says one of the requirements to exclude parts from the model is that "Work to be performed in excluded parts of the building shall meet the requirements of Sections 5-10."

5
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Fri Nov 6, 2015, 9:09 pm

Help modeling heating only building

NC-2009 EAc1:Optimize Energy Performance
posted by  Logan Dorrell  on 

We are modeling a building in EnergyPro that is heating only, with radiant heating panels and ventilation thru DOAS.

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Fri Nov 6, 2015, 7:58 pm

Green Cleaning in a Semiconductor Fab???

EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Program
posted by  David Gibney  on 

I posed this question for a NC-2009 project a week ago and received no replies, so thought I'd re-post it here: I'm working on a semiconductor fab that is part of a LEED campus project.

7
Tue Nov 3, 2015, 10:35 pm

50% or Residents and Buildings with Access

ND-v2009 SLLc3:Locations with reduced automobile dependence
posted by  Sara Zoumbaris  on 

My question is in regards to the 50% requirement of residents and the # of weekday trips.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Nov 2, 2015, 6:15 pm

Bus Stops Planned, Not Yet Built

ND-v2009 SLLc3:Locations with reduced automobile dependence
posted by  Sara Zoumbaris  on 

I am hoping someone can confirm for me whether planned bus stops which are not yet official/ in place but are guaranteed, may be included for credit achievement?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Nov 2, 2015, 6:14 pm

How to deal with a hotel.

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Susan Di Giulio  on 

Others have asked this before and not gotten an answer so I'm taking another shot. Can someone please verify this approach?

2
Fri Oct 30, 2015, 7:06 pm

Gym Floor Paints

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Shelley White  on 

Does anyone know if the graphic arts coating VOC limit of 500 g/L used for Game Line paints is acceptable or do game line paints have to comply with the 150 g/L limit effective 1/1/14?

4
Fri Oct 30, 2015, 12:07 am