Forum quick links
new floor in existing building envelope
NC-2009 PIf2:Project Summary Detailsposted by KIMBERLY KRAFT on
Hello LEEDUsers, We are submitting a project for LEED NC v.2009 - major renovation and new construction.
AP Certification on v2009
CI-2009 IDc2:LEED Accredited Professionalposted by Paul Duva on
I am working on a v2009 LEED project and am the currently the LEED AP on the project for our IDc2 credit. I originally had a LEED AP & a LEED BD+C, however my BD+C has expired.
Dorm Suite Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by BAOQUY VU on
Our project is a large high rise dorm consisting of 4-person suites arranged typically as a 2BR and two 1BR's connected by a short inner hallway.
Modeling additions and alterations
NC-2009 EAp2:Minimum Energy Performanceposted by Cory Duggin on
Table G3.1 section 2 a says one of the requirements to exclude parts from the model is that "Work to be performed in excluded parts of the building shall meet the requirements of Sections 5-10."
Help modeling heating only building
NC-2009 EAc1:Optimize Energy Performanceposted by Logan Dorrell on
We are modeling a building in EnergyPro that is heating only, with radiant heating panels and ventilation thru DOAS.
Green Cleaning in a Semiconductor Fab???
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by David Gibney on
I posed this question for a NC-2009 project a week ago and received no replies, so thought I'd re-post it here: I'm working on a semiconductor fab that is part of a LEED campus project.
50% or Residents and Buildings with Access
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Sara Zoumbaris on
My question is in regards to the 50% requirement of residents and the # of weekday trips.
Bus Stops Planned, Not Yet Built
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Sara Zoumbaris on
I am hoping someone can confirm for me whether planned bus stops which are not yet official/ in place but are guaranteed, may be included for credit achievement?
How to deal with a hotel.
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Susan Di Giulio on
Others have asked this before and not gotten an answer so I'm taking another shot. Can someone please verify this approach?
Gym Floor Paints
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Shelley White on
Does anyone know if the graphic arts coating VOC limit of 500 g/L used for Game Line paints is acceptable or do game line paints have to comply with the 150 g/L limit effective 1/1/14?