Forum quick links
Concessions Spaces
posted by Deborah Ebersole on
We are looking to certify nineteen concession spaces in an existing airport. The spaces all share one mechanical system and one water source and do not appear to be sub-metered.
Providing dedicated area for mercury-containing products?
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Richard Barlow on
We are trying to respond to Prelim. Design review comments on a LEED-HC v2009 project for an Inpatient Hospice and Palliative Care facility.
Option B for a reception area in a massive office tower lobby
NC-2009 IEQc8.1:Daylight and views - daylightposted by Elliot Young on
So, back again to ask another one. We are ever so close to reaching 75% threshold and without having the engineers run daylight models or measure the space I'm trying to pick up any space we can.
Light in open 3 story mezzanines
NC-2009 IEQc8.1:Daylight and views - daylightposted by Elliot Young on
We just received our design credit responses and used method 2 - Prescriptive. We have a 3 story cafeteria space within a 30 story office building.
School as a Teaching Tool and Green Education
NC-2009 IDc1:Innovation in designposted by emily reese moody on
I am posting my question here, since it appears the v2.2 ID forum is closed for new comments. I have a v2.2 LEED-NC Campus project working on the final construction submission.
Existing Building Baseline WWR
NC-2009 EAc1:Optimize energy performanceposted by Christian Kaltreider on
Referencing 90.1 Table G3.1.5: I understand that the envelope for an existing building baseline model should reflect existing conditions concerning thermal properties of walls and windows.
Outside Mat
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Waterset CDD on
Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.
Waste Oil Fuel
NC-2009 EAp2:Minimum energy performanceposted by Michael Daly on
I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.
SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Shad Traylor on
SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if
Open Space Accessibility
NC-2009 SSc5.2:Site development - maximize open spaceposted by Ilana Judah on
We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.