Concessions Spaces

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Deborah Ebersole  on 

We are looking to certify nineteen concession spaces in an existing airport. The spaces all share one mechanical system and one water source and do not appear to be sub-metered.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Sat Feb 27, 2016, 9:11 pm

Providing dedicated area for mercury-containing products?

Healthcare-v2009 MRp2:PBT source reduction - mercury
posted by  Richard Barlow  on 

We are trying to respond to Prelim. Design review comments on a LEED-HC v2009 project for an Inpatient Hospice and Palliative Care facility.

2
Thu Feb 25, 2016, 2:24 pm

Option B for a reception area in a massive office tower lobby

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Elliot Young  on 

So, back again to ask another one. We are ever so close to reaching 75% threshold and without having the engineers run daylight models or measure the space I'm trying to pick up any space we can.

3
Default Avatar
Designer
Rinkachung Architecture
LEEDuser Basic Member
1 thumbs up
Wed Feb 24, 2016, 1:40 pm

Light in open 3 story mezzanines

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Elliot Young  on 

We just received our design credit responses and used method 2 - Prescriptive. We have a 3 story cafeteria space within a 30 story office building.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Feb 19, 2016, 10:37 pm

School as a Teaching Tool and Green Education

NC-2009 IDc1:Innovation in design
posted by  emily reese moody  on 

I am posting my question here, since it appears the v2.2 ID forum is closed for new comments. I have a v2.2 LEED-NC Campus project working on the final construction submission.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Thu Feb 18, 2016, 7:50 pm

Existing Building Baseline WWR

NC-2009 EAc1:Optimize energy performance
posted by  Christian Kaltreider  on 

Referencing 90.1 Table G3.1.5: I understand that the envelope for an existing building baseline model should reflect existing conditions concerning thermal properties of walls and windows.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Feb 16, 2016, 5:58 pm

Outside Mat

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Waterset CDD  on 

Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Fri Feb 12, 2016, 5:31 pm

Waste Oil Fuel

NC-2009 EAp2:Minimum energy performance
posted by  Michael Daly  on 

I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Feb 11, 2016, 9:49 pm

SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Shad Traylor  on 

SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Thu Feb 11, 2016, 12:47 am

Open Space Accessibility

NC-2009 SSc5.2:Site development - maximize open space
posted by  Ilana Judah  on 

We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.

3
Wed Feb 10, 2016, 3:25 pm