Light in open 3 story mezzanines

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Elliot Young  on 

We just received our design credit responses and used method 2 - Prescriptive. We have a 3 story cafeteria space within a 30 story office building.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Feb 19, 2016, 10:37 pm

School as a Teaching Tool and Green Education

NC-2009 IDc1:Innovation in Design
posted by  emily reese moody  on 

I am posting my question here, since it appears the v2.2 ID forum is closed for new comments. I have a v2.2 LEED-NC Campus project working on the final construction submission.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 18, 2016, 7:50 pm

Existing Building Baseline WWR

NC-2009 EAc1:Optimize Energy Performance
posted by  Christian Kaltreider  on 

Referencing 90.1 Table G3.1.5: I understand that the envelope for an existing building baseline model should reflect existing conditions concerning thermal properties of walls and windows.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Feb 16, 2016, 5:58 pm

Outside Mat

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Waterset CDD  on 

Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 12, 2016, 5:31 pm

Waste Oil Fuel

NC-2009 EAp2:Minimum Energy Performance
posted by  Michael Daly  on 

I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 11, 2016, 9:49 pm

SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Shad Traylor  on 

SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Thu Feb 11, 2016, 12:47 am

Open Space Accessibility

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Ilana Judah  on 

We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.

3
Wed Feb 10, 2016, 3:25 pm

Fire Extinguisher & Cabinet (MRc4 & MRc5)

NC-2009 MRc4:Recycled Content
posted by  Elliot Young  on 

Hi, we just received a submittal for fire extinguishers and recessed fire extinguisher cabinets - claiming to have recycled content and regional materials.

2
Associate
NK Architects
LEEDuser Basic Member
11 thumbs up
Fri Feb 5, 2016, 1:47 am

New Option: Outdoor walking path

Pilot-Credits EQpc78:Design for active occupants
posted by  Stephanie Graham  on 

I'd like to see an option for a walking/running path on the site of at least a mile in length and/or fitness cross-training stations at intervals along the path.

3
Thu Feb 4, 2016, 3:44 pm

Square Footage of Parking Areas

NC-2009 PIf2:Project Summary Details
posted by  Deirdre Espiritu  on 

Where are the guidelines on how to do this takeoff? Because parking is connected by vehicle circulation spaces as well is it correct to just use the area of the actual parking spaces?

2
Senior Sustainability Manager
WSP
LEEDuser Expert
53 thumbs up
Tue Feb 2, 2016, 4:58 am