Process verses intent
posted by Martha Norbeck on
The LEED reviewers, once again, have succeeded in exasperating me and my team. We submitted under alternative compliance making a case that our approach supports the intent of the credit and why.
Chilled Water Use for part of a floor
CI-v4 EAc3:Advanced energy meteringposted by Annie Argento on
How would a tenant who leases part of a floor in a high rise building meter their use of chilled water from the base building plant?
Recert vs. new Cert
posted by Jessica Hawley on
Reading through this forum I still don't think I see a clear consensus on recert vs. new cert. I have a client who was originally certified in 2011 EBOM and they are up for recertification.
Walking distance from the barracks
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jose Dehitta on
Our project is a cafeteria which is inside the military base. All the soldiers walks from their barracks to eat or pick up food at the cafeteria. Can we use Option #2 to get 6 points?
Concessions Spaces
posted by Deborah Ebersole on
We are looking to certify nineteen concession spaces in an existing airport. The spaces all share one mechanical system and one water source and do not appear to be sub-metered.
Providing dedicated area for mercury-containing products?
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Richard Barlow on
We are trying to respond to Prelim. Design review comments on a LEED-HC v2009 project for an Inpatient Hospice and Palliative Care facility.
Option B for a reception area in a massive office tower lobby
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Elliot Young on
So, back again to ask another one. We are ever so close to reaching 75% threshold and without having the engineers run daylight models or measure the space I'm trying to pick up any space we can.
Light in open 3 story mezzanines
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Elliot Young on
We just received our design credit responses and used method 2 - Prescriptive. We have a 3 story cafeteria space within a 30 story office building.
School as a Teaching Tool and Green Education
NC-2009 IDc1:Innovation in Designposted by emily reese moody on
I am posting my question here, since it appears the v2.2 ID forum is closed for new comments. I have a v2.2 LEED-NC Campus project working on the final construction submission.
Existing Building Baseline WWR
NC-2009 EAc1:Optimize Energy Performanceposted by Christian Kaltreider on
Referencing 90.1 Table G3.1.5: I understand that the envelope for an existing building baseline model should reflect existing conditions concerning thermal properties of walls and windows.