Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

How do I calculate the total runoff, if I am required to send rainwater elsewhere?

EBOM-v4.1 SSc1:Rainwater Management
posted by  Rick Fox  on 

I have so many questions concerning storm water management.   My company is a large warehouse.  We have 350 truck parking spots as well as 150 employee parking spots and a 525,000 sq

0

Averaging Facility Rates over Time

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Vanessa Hostick Rempe  on 

The credit guidance notes that to apply rates over time, a project's waste should be the weighted average for the facility over the time in which the project sent materials to the facility.

1
Thu Aug 10, 2023, 3:43 pm
1
Thu Mar 21, 2024, 6:32 pm

Schedule for Data Center Load

NC-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time?

1
Wed Aug 9, 2023, 8:37 pm
38
LEEDuser Basic Member
8 thumbs up
Fri Aug 4, 2023, 8:04 am

Does LEED Project hours count towards LEED Specific CE Hours and Regular CE Hours

LEED Recertification: When and How
posted by  Richard Metts  on 

Hello everyone, I am working on a LEED project and I am the person responsible for gathering and uploading the LEED data into the USGBC data base.  My CE reporting date is coming up soon.&nbsp

7
CPC, LEED AP BD+C
Durotech, Inc.
LEEDuser Basic Member
3 thumbs up
Thu Aug 3, 2023, 3:20 pm

Have any projects outside of Washington DC pursued this credit?

Pilot-Credits SSpc130:Offsite Rainwater Management
posted by  elena sviatoslavsky  on 

I'm wondering if any project outside of Washington DC pursued this pilot credit. If so, please describe the process and which SRC market was used to purchase SRCs.

0

ASHRAE 55-2010 documentation

NC-v4 EQc5:Thermal comfort
posted by  Katie Vasbinder  on 

The Upload for this credit indicates "Documentation may include a psychometric chart, PMV/PPD calculations... Figure 5.2.4.1 and/or Figure 5.2.4.4, or predicted worst case...".

5
Default Avatar
Schnackel Engineers, Inc. - Energy
LEEDuser Premium Member
3 thumbs up
Wed Jul 26, 2023, 2:48 pm

Band for UMLHs for vault spaces in a Data Center

NC-v4 EAc2:Optimize energy performance
posted by  Rajat Wadhwa  on 

Hi , I am modeling a LEED model for data center, now for vault spaces I am assuming a setpoint of 99 F for cooling and 20 F for heating, what should be band to consider a vault space UMLH?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Jul 21, 2023, 5:27 pm

Option 2, A

NC-v4 EQc6:Interior lighting
posted by  Simon Lai  on 

In the open office, I'm providing direct/indirect fluorescent up-light, does it meet the exception of the Option 2A?

3
Default Avatar
Green building manager
Confidential
LEEDuser Basic Member
13 thumbs up
Thu Jul 20, 2023, 9:18 pm