Modeling Office Space in an Existing High Rise Building

CI-v4 EAp2:Minimum energy performance
posted by  Annie Argento   on 

We're using eQuest to model a tenant improvement office space, which is about half of one story in a 28 story high rise office building in LA.

2
Wed Mar 15, 2017, 2:06 pm

Dedicated bike lanes

Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Phillip Henning  on 

What is a dedicated bike lane? I have a sidewalk leading to a new elementary school in two different directions. One is approximately 100 feet long from the from the primary access road.

3
Tue Mar 14, 2017, 11:15 pm

Section 3.10 compliance

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Edgar Arevalo  on 

I'm working on a CI project that we are currently designing VAVs for the floor(s), the main AHUs are not part of the scope of work but they have VFDs.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Mon Mar 13, 2017, 1:30 pm

Air testing related to partial renovation per floor

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Julie Barth  on 

I have a client who is asking about air testing for an office building renovation project where small parts of each floor will be renovated.

4
Default Avatar
Industrial Hygienist
Aria Environmental, Inc.
LEEDuser Basic Member
1 thumbs up
Sat Mar 11, 2017, 12:44 am

2010 AGMBC v2

LEED Guidance for Campuses and Multiple Buildings
posted by  Francis Hernández  on 

We are a GC with primarily Federal Government construction contracts. We have a project that references the 2010 LEED AGMBC v2 and I cannot find it anywhere.

3
Design Manager
Caddell Construction Co. (DE), LLC
LEEDuser Basic Member
2 thumbs up
Mon Mar 6, 2017, 7:59 pm

Adding more projects to a Campus

LEED Guidance for Campuses and Multiple Buildings
posted by  Deborah Lucking  on 

We have a campus project that has completed Final Design Review. The owner is looking at adding more buildings to the campus, at some point in the future. 1.

4
Thu Mar 2, 2017, 8:26 pm

Handwatering in lieu of temporary irrigation

NC-2009 WEc1:Water Efficient Landscaping
posted by  Mickela Pallares  on 

Has anyone had any experience in submitting handwatering by the landscape maintenance crew for establishment, instead of temporary above ground irrigaiton?

2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Thu Mar 2, 2017, 3:13 pm

Previously developed

ND-v4 SLLc1:Preferred locations
posted by  Sarah Kearney  on 

Hello, We are developing 50-acre of mixed-use development. Currently mainly all the land is parking lots and has been so for over 20 years.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Mar 1, 2017, 11:04 pm

Transfer Grills

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Alfonzo Collins  on 

We are hoping to directly duct fresh air into a small utility room adjacent to an open room.

5
Wed Mar 1, 2017, 9:32 pm

Inverted Marking Paint

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Lawrence Lile  on 

I've got a contractor who is just wild about Inverted Marking Paint - orange spray paint that can spray upside down. This stuff is in no way LEED compliant.

4
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Wed Mar 1, 2017, 5:05 pm