Forum quick links
Previously developed
ND-v4 SLLc1:Preferred locationsposted by Sarah Kearney on
Hello, We are developing 50-acre of mixed-use development. Currently mainly all the land is parking lots and has been so for over 20 years.
Transfer Grills
NC-2009 IEQp1:Minimum IAQ Performanceposted by Alfonzo Collins on
We are hoping to directly duct fresh air into a small utility room adjacent to an open room.
Inverted Marking Paint
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Lawrence Lile on
I've got a contractor who is just wild about Inverted Marking Paint - orange spray paint that can spray upside down. This stuff is in no way LEED compliant.
District Energy Cx Guidance
NC-v4 EAp1:Fundamental commissioning and verificationposted by Candice Rogers on
Hello, We have a project that meets the requirements of District Energy Systems. There is one new piece of equipment and multiple existing that will serve the facility.
MR 2.2 Form Change
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Fred Smith on
I am confused as the the new form on LEED On Line vs what you are showing on LEED User. I am not sure what is needed to upload in regards to our purchasing and criteria for sustainability.
Documented floor plans with occupancy scale
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Edgar Arevalo on
Before I began uploading the floor plans showing the controls and lighting equipment on the LEED online template for EAc1.2, I noticed that the templates requests floor plans indicated which zones
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Helene Lefkowitz on
Are CSRs required simply for manufacturer's (a blanket report that encompasses all products made by a particular manufacturer), or are CSRs required for each individual product?
Data Center CxA
NC-v4 EAp1:Fundamental commissioning and verificationposted by Peter Dishno on
The LEED V4 book has the comment: "DATA CENTERS ONLY For small projects with computer room peak cooling loads less than 2,000,000 Btu/h (600 kW) or a total computer room peak cooling load less tha
Maximum threshold for General VOC emissions compliance?
NC-v4 EQc2:Low emitting materialsposted by Joanna Switzer on
Hi, I am not finding any info to suggest a maximum VOC limit allowable under the General Emissions. Does "5.0 mg/m3 or more" really include everything greater than 5.0mg?
No FTE
NC-v4 MPR3:Must comply with project size requirementsposted by Claire DeCamp on
We've got a building with no FTE - it houses mostly lab equipment that is managed by a researcher and then left alone. There are no restrooms, offices, etc.