Forum quick links
Pilot Credit Closed
Pilot-Credits EQpc22:Interior lighting - qualityposted by Laurel Swan on
This Pilot Credit is now listed as closed to new registrations and I do not see it in the Innovation Catalog. Does that mean that this is no longer an option for an Innovation in Design credit?
BAS - whole building
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Craig Wilson on
If our project's BAS controls 100% of the building's heating and air conditioning, but only 35% of the building's ventilation (by square footage), can we still pursue this credit?
Energy Modeling Requirements
Retail-CI-v4 EAp2:Minimum energy performanceposted by Jeff Halliwell on
On LEED V4, ID+C Commercial Interiors:Retail, is there an option to use the California Title 24 as the calculation method or do you have to use ASHRAE 2010?
LEED Rating System for tenant in existing building
posted by Jennifer Isaac on
My client is a pharmaceutical facility that occupies part of the area of an existing building.
WEp1 for Shopping Center
posted by Nate Steeber on
Hello all, We have a shopping center interested in certification with 10 buildings.
Motorcycle Parking Under Cover
NC-v4 LTc7:Reduced parking footprintposted by Dana Waters on
Can you please help to clarify? What if the motorcycle parking is under cover of a shade structure?
LEED Boundary on large site multiple buildings - 1 certifiable
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Alexander Clark on
I have a project that is on a 50 acre site that will be all developed. The project will have (7) structures on the site.
Rideshare Bike Rentals
NC-v4 LTc5:Access to quality transitposted by Samantha Varela on
Hi, My project is located within 1/4 mile (400 meter) walking distance of a Citi Bike Rental station that when at full capacity holds 14 bikes. Would this be considered ride share?
If Purchasing Chilled Water from Campus Central Plant...
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Nelina Loiselle on
We have a project that we are modeling as purchased chilled water and steam because it is on a campus that includes a central plant. The campus sells the utilities to the department.
Master's Research Survey
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati for my Master's thesis in support of my hypothesis.