Dining facility overall area with or without walk-in coolers
NC-2009 EAp2:Minimum energy performanceposted by Addisu Lemlem on
To generate baseline for HVAC systems, the building total SF is 28000 including walk-in coolers and an outside mechanical room. My question is, Can I model the walk-in cooler separate?
Future Expansion
NC-2009 PIf2:Project Summary Detailsposted by Mary Kay on
We have a building under construction now for which we will pursue LEED certification.
Exterior doors in meeting rooms
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Jeannie Rueter on
The conference center I'm working on has several small meeting rooms that have interior and exterior doors with the exterior doors leading to open public terraces.
Varying Transit Schedules
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Risto Beatty on
I am working on a project located on a college campus where various university bus lines provide 350 rides per day while school is in session.
OA Air Flow Monitoring in Laundry
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Joe Kaminski on
The project I am working on has large laundry area with outside air provided for makeup air for the dryer exhaust.
Need for consistent numbering system across all rating systems
posted by Lyle Axelarris on
I definitely like having credit numbers as they save a lot of time in communication and reference.
Baseline Ratios
CI-v4 LTc5:Reduced parking footprintposted by Kena David on
I am having a similar problem like many who have posted here with no reply. Could you please provide guidance as to how to interpret the Institute of Transportation Engineers tables?
Service life of a piece of HVAC equipment?
NC-2009 EAc4:Enhanced refrigerant managementposted by Rosemary Ziemann on
The link above for the 2007 ASHRAE Applications Handbook, HVAC Applications seems to be broken.
Unfinished Spaces Baseline and Proposed System
NC-2009 EAp2:Minimum energy performanceposted by Phil Stafa on
Hello: I have a 3 story mixed use healthcare facility with offices, exam rooms, treatment rooms, research areas, and a surgical suite.
Where do I upload the response report for Design Final Package ?
NC-2009 EAp2:Minimum energy performanceposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.