insulation thickness versus energy modeling
NC-v4 EAp2:Minimum energy performanceposted by Jennifer Webb on
We are running into a situation where the insulation is slightly under the R38 (R34.8) that is required per ASHRAE 90.1 yet the energy model shows we are over 10% energy efficient.
is this PC still open?
Pilot-Credits PC29:Housing and Jobs Proximityposted by Alfonzo Collins on
...and can I use it on a LEED-NC project? I'm working on a building in NYC, so this would be a very easy two points, if applicable. Thanks!
Material & Recycled Calculator - v2009
NC-2009 MRc5:Regional Materialsposted by Denise Domino on
Can a reviewer tell me how they would like to see this spreadsheet set up? I started with entering as I got the information and then quickly realized when I needed to add another Vendor to the pro
Roof for School
Schools-NC-v4 EQc2:Low emitting materialsposted by Josh Inge on
If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?
long term lease as NC innovation credit
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Maggie Pipek on
Has anyone ever successfully modeled an ID credit for the NC rating system after the CI MRc1.1 Long Term Lease credit?
Existing Insulated Glass Units
CS-2009 EAp2:Minimum Energy Performanceposted by Donald Green on
We have an existing building whereby some of the existing glass will remain however we cannot determine what the thermal properties of the glass is because there is no documentation and the manufac
Irrigation Submetering
EBOM-v4 SSp1:Site management policyposted by Ileana Delgado on
Under the Site Management Policy template there is an area on irrigation management which explains the procedure for a proper preventive maintenance, and it mentions: Check for leaks using irrigati
Option 2 for a Partially Enclosed Building (LEED NCv2.2)
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by SIG - Sustainability Main Account on
We performed IAQ testing to meet IEQc3.2 on a subway station. The IAQ levels passed easily, and our approach was recognized by the LEED reviewer as an appropriate approach.
Filtration Change Prior to Flush-out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Marcia Weekes on
On one project, the GC replaced construction filters at AHUs with final filters two months ago. However, delays in TAB and commissioning has delayed the start of the building flush-out.
FYI... CIR has been posted re: combination of Option 1 and 2
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by SIG - Sustainability Main Account on
Lots of comments and threads have occurred here regarding combining FE/LE spaces and Electric Fueling Charging stations.