Forum quick links
Same Landscaped Area but Different Plantings?
CS-2009 WEc1:Water Efficient Landscapingposted by Brian Salazar on
I should know this, but.... Is it OK to run the WEc1 calcs with the same landscaped area (in square feet), but with different plantings in the baseline and design cases?
Innovation point for NCv3?
NC-v4 MRc1:Building life-cycle impact reductionposted by Erica Downs on
Any idea if this credit could be followed for an innovation point under v3? We are reusing an historic church, with an addition.
FTE, visitor count and space usage in shell space
NC-2009 PIf3:Occupant and Usage Dataposted by JASON BONE on
We are working on a major renovation healthcare project for a four story building which is fully owned by the owner.
Indoor recreational facility
ND-Plan-v4 NPDc10:Access to recreation facilitiesposted by Sarah Kearney on
Hello, Would an indoor gym that's at least 25,000 square feet and available to anyone (non members can pay for a day pass) be acceptable?
Changes during Design Review
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, We are currently responding to LEED Reviewer comments for a building.
Residential on a university campus.
NC-v4 LTc4:Surrounding density and diverse usesposted by Peter Doo on
How are student residence halls classified on a college campus?
Emergency Lighting within Daylight Zone
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by William Weaver on
I have a scenario where the core is offset, and is tight to the building envelope on one side. As a result, the egress path around the core on this side falls within the 15' perimeter.
Updated/clarified primer voc limit
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Martha Norbeck on
Can you please update the FAQ section of LEED-NC v2009, IEQc4.2. The information on primers is out of date per interpretation/addenda #100001805.
Replacing filters prior to occupancy
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ashley Love on
We have our preliminary review comments back and had a comment on this credit about the timeline of replacing the filters.
Number of signs required to be considered "comprehensive"
NC-2009 IDc1:Innovation in Designposted by Kristin Walsh on
I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.