New Bus Depot: LEED BD+C or C+S?
posted by Cynthia Kaplan on
My project is the new construction of a 3,000 s.f. bus depot in a small city. Part of the space will be leased to a retailer at a later date, most likely a convenience store or coffee shop.
Option 1: Limited Turf Area
EBOM-v4 SSc5:Site managementposted by Stephanie Donovan on
Hello - the site I'm looking at already has under 25% turf area. In fact it has no turf, only vegetation.
IAQ Procedure is NOT acceptable?
CI-2009 IEQp1:Minimum IAQ Performanceposted by James Keohane on
I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.
Preferred Parking
Retail-NC-v2009 SSc4:Alternative transportationposted by Kevin Flynn on
The LEED NC-Retail v2009 credit 4.3 and 4.4 to provide preferred parking for LEV/FE vehicles and Carpools appears to require that the project identify employee parking separate from customer parkin
Existing Site Conditions altered w/in project boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Jim Pugh on
All, We submitted a dormitory project for a university in which there was a very substantial amount of existing parking between our new building and another part of our project (a new, relatively
Attempting to return ceiling tiles from demo
CI-2009 MRc2:Construction Waste Managementposted by Dean Wilson on
We are performing a 2009 Commercial Interior for the reuse of a 7000 sq ft decommissioned Army base building. In the demolition phase, we collected old ceiling tiles to return to the manufacturer.
DES Option 1 - Baseline System Heating Type Modeling Guidance
Healthcare-v2009 EAc1:Optimize energy performanceposted by Mike Ramos on
Hi all, I'm hoping someone can clarify how to model the ASHRAE Baseline systems in compliance with the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and Constru
Zero lot line
EBOM-v4 SSc5:Site managementposted by Lawrence Lile on
Can a zero lot line building achieve this credit?
LEED Selection - High Rise Residential
posted by Curt Pascoe on
I am working on a unique project. 30 story existing historic building, office.
Natural Ventilation
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Benjamin Cullum on
Under option 2 How do you determine how many sampling stations are needed in a building that is uses Natural ventilation?