Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

New Bus Depot: LEED BD+C or C+S?

LEED Rating System Selection
posted by  Cynthia Kaplan  on 

My project is the new construction of a 3,000 s.f. bus depot in a small city. Part of the space will be leased to a retailer at a later date, most likely a convenience store or coffee shop.

1
Fri Nov 27, 2015, 6:12 pm

Option 1: Limited Turf Area

EBOM-v4 SSc5:Site management
posted by  Stephanie Donovan  on 

Hello - the site I'm looking at already has under 25% turf area. In fact it has no turf, only vegetation.

1
Wed Sep 14, 2016, 4:23 pm

IAQ Procedure is NOT acceptable?

CI-2009 IEQp1:Minimum IAQ Performance
posted by  James Keohane  on 

I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.

1
Tue Jan 24, 2017, 2:21 pm

Preferred Parking

Retail-NC-v2009 SSc4:Alternative transportation
posted by  Kevin Flynn  on 

The LEED NC-Retail v2009 credit 4.3 and 4.4 to provide preferred parking for LEV/FE vehicles and Carpools appears to require that the project identify employee parking separate from customer parkin

1
Tue Aug 15, 2017, 9:01 pm

Existing Site Conditions altered w/in project boundary

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Jim Pugh  on 

All, We submitted a dormitory project for a university in which there was a very substantial amount of existing parking between our new building and another part of our project (a new, relatively

0

Attempting to return ceiling tiles from demo

CI-2009 MRc2:Construction Waste Management
posted by  Dean Wilson  on 

We are performing a 2009 Commercial Interior for the reuse of a 7000 sq ft decommissioned Army base building. In the demolition phase, we collected old ceiling tiles to return to the manufacturer.

1
Thu Feb 11, 2016, 7:57 pm

DES Option 1 - Baseline System Heating Type Modeling Guidance

Healthcare-v2009 EAc1:Optimize energy performance
posted by  Mike Ramos  on 

Hi all, I'm hoping someone can clarify how to model the ASHRAE Baseline systems in compliance with the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and Constru

0

Zero lot line

EBOM-v4 SSc5:Site management
posted by  Lawrence Lile  on 

Can a zero lot line building achieve this credit?

1
Wed Mar 15, 2017, 9:36 pm

LEED Selection - High Rise Residential

LEED Rating System Selection
posted by  Curt Pascoe  on 

I am working on a unique project. 30 story existing historic building, office.

1
Wed Mar 30, 2016, 1:08 pm

Natural Ventilation

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Benjamin Cullum  on 

Under option 2 How do you determine how many sampling stations are needed in a building that is uses Natural ventilation?

1
Thu Mar 19, 2015, 10:46 pm