Forum quick links
Increasing certification level after accepting certification?
posted by Tommy Linstroth on
Is it possible to improve your certification level after accepting final certification?
WEc3 denial
NC-2009 WEc3:Water Use Reductionposted by Therese Thompson on
We received our final review on Friday, and do not understand why Credit WEc3 was denied.
Enhance Cx, 10 month review of building operation
NC-2009 EAc3:Enhanced Commissioningposted by Laura Howe on
Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?
Roof Terrace Storm Drains
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Jeannie Rueter on
I'm working on a major remodel project next to the ocean.
Refrigerant Atmospheric Impact
EBOM-v4 EAc8:Enhanced refrigerant managementposted by Meier Corporate Account on
Good Morning, I am currently working on this credit and something in the guide (page 301) does not make much sense to me... At the top of the page in Table 3 it has the calculation for the RAI as
C&S 2009 Retail tenant space
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by London Huenefeld on
I am working on a C&S project in which most of the tenants are retail stores.
Existing MultiFamily High Rise-Exclude Occupied Commerical Space
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laura Steinbrink on
We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.
Medical records room with 7 cubicles.
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
I was wondering in order to comply with this credit, will we have to provide thermal controllability for 50% of the 7 cubicles or can we just consider it a multi-occupant space?
SS4.4 NC - Fire / Rescue Station
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Shalini Gali on
Hi, We are considering LEED NC v2009 certification for a fire& rescue station, but couldn't find applicable Land Use type in ITE "Parking Generation" study for fire stations.
Vairable flow showers
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Nicholas Bristow on
We are considering using multi-flow shower heads on a commercial office project for the locker rooms.