Forum quick links
Roof Terrace Storm Drains
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Jeannie Rueter on
I'm working on a major remodel project next to the ocean.
Refrigerant Atmospheric Impact
EBOM-v4 EAc8:Enhanced refrigerant managementposted by Meier Corporate Account on
Good Morning, I am currently working on this credit and something in the guide (page 301) does not make much sense to me... At the top of the page in Table 3 it has the calculation for the RAI as
C&S 2009 Retail tenant space
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by London Huenefeld on
I am working on a C&S project in which most of the tenants are retail stores.
Existing MultiFamily High Rise-Exclude Occupied Commerical Space
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laura Steinbrink on
We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.
Medical records room with 7 cubicles.
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
I was wondering in order to comply with this credit, will we have to provide thermal controllability for 50% of the 7 cubicles or can we just consider it a multi-occupant space?
SS4.4 NC - Fire / Rescue Station
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Shalini Gali on
Hi, We are considering LEED NC v2009 certification for a fire& rescue station, but couldn't find applicable Land Use type in ITE "Parking Generation" study for fire stations.
Vairable flow showers
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Nicholas Bristow on
We are considering using multi-flow shower heads on a commercial office project for the locker rooms.
PC 112 Calculating costs
posted by Maki San Miguel Paulson on
The requirement is to use 25% by cost, of the total value of permanently installed products in the project.
Maximum frontage without windows on primary facade
Pilot-Credits PC14:Walkable Streetsposted by Margaret Montgomery on
The project I'm testing this pilot credit with meets all but requirement 8, so the pilot credit has been "met".
What materials are to be included?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Thomas Button on
I have a project that was submitted under LEED BD+C Core & Shell.