Forum quick links
Gross Floor Area
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage. Since gross floor area also includes the exterior wall
Total Material Cost
posted by Arda Buyuklu on
Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form?
LEED point adjustment when ASHRAE 90.1-2019 is used as baseline
NC-v4.1 EAp2:Minimum Energy Performanceposted by elvin ruya on
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016?
Pilot Inclusive Design
Pilot-Credits INpc125:Inclusive Designposted by Laurie Johnson on
I am working on a LEED CI and WELL at Scale project.
Testing strips - other manufacturers
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Beth Brownlie on
Has anyone had any experience with other manufacturers for the testing strips. Also, what has been the adoption rate of this testing protocol with cleaning staff?
Any way to download LEED project data?
posted by Sustainability Ballinger on
I'm working on creating a database of our firm's project data, specifically around our sustainability efforts. I don't currently see any way on the LEED Online website to download in a data-c
EV space accessibility
NC-v4.1 LTc8:Electric Vehiclesposted by Lawrence Rennell on
Do all EV spaces required to be available to the general public?
Non-linear primary direction of travel.
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Michelle Halle Stern on
Our entry includes a centered revolving door with people doors on either side.
MRpc103 Integrative Analysis of Building Materials
NC-v4 INc1:Innovationposted by Lisa Bolle on
As our project team was performing the analysis of three products, we realized that another potentially useful strategy would be to compare three similar products and use the integrative analysis w
High Rise Residential
NC-v4 EAc3:Advanced energy meteringposted by Megan White on
We have a 24 story high rise residential apartment project that wants to pursue this credit however we are looking for guidance as this seems more geared towards commercial office projects with mul