Does type of signage matter?

CI-v4 EQp2:Environmental tobacco smoke control
posted by  Edgar Arevalo  on 

Does it matter the type of signage that's displayed at the entries of the building?  I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly

0

Modeling Proposed DHW with Insulation

NC-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

Hi I am Modeling a DHW system and most of my savings are coming from Insulation in the heater tank, now the LEED reviewer said that the savings should be modeled with Exceptional Calculation MEthod

4
Wed Jan 31, 2024, 10:32 pm

Onsite and Offsite Both?

Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protection
posted by  Umesh Atre  on 

Hi - Are projects that are pursuing the onsite habitat protection/restoration credit allowed to go for this Pilot in addition, or is this considered to be an alternate compliance path only?

2
Project Manager
Energy Systems LLC
LEEDuser Basic Member
0 thumbs up
Wed Jan 31, 2024, 3:57 pm

LEED O+M v4 Warehouses and Distribution Centers

LEED Rating System Selection
posted by  Ralph Bicknese  on 

We are evaluating utilizing LEED O+M for Warehouses and Distribution Centers for a 1.5M sf Distribution Center where the all parties are very interested in being able to achieve a LEED rating and r

1
Thu May 9, 2024, 10:10 pm

Hiring - LEED Project Administrator

Help Wanted: LEED-related Jobs
posted by  Trisha Highnote  on 

Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR.

0

Mastic

NC-v4.1 EQc4:Indoor Air Quality Assessment
posted by  Michelle Lockert  on 

Can anyone tell me if it is okay to utilize mastic “outside” the building envelope?

Thank you.

2
Sun Jan 14, 2024, 4:04 am

View Type 1 with non-continuous window glazing

NC-v4 EQc8:Quality views
posted by  Edgar Arevalo  on 

I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous.  The wall space between windows are a

8
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Jan 11, 2024, 6:46 pm

"Weighted sum of non-roof and roof measures" Issue

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and roof area for 2 points."