Does type of signage matter?
CI-v4 EQp2:Environmental tobacco smoke controlposted by Edgar Arevalo on
Does it matter the type of signage that's displayed at the entries of the building? I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly
Modeling Proposed DHW with Insulation
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am Modeling a DHW system and most of my savings are coming from Insulation in the heater tank, now the LEED reviewer said that the savings should be modeled with Exceptional Calculation MEthod
Onsite and Offsite Both?
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Umesh Atre on
Hi - Are projects that are pursuing the onsite habitat protection/restoration credit allowed to go for this Pilot in addition, or is this considered to be an alternate compliance path only?
Guidance on Onsite Compost Processing for SSpc129 / Pilot Credit
NC-v4.1 INc1:Innovationposted by Teresa Cortes on
Hi Everyone,
Seeking Insights on Implementing All Gender Restrooms (WEpc147) Pilot Credit
NC-v4.1 INc1:Innovationposted by Teresa Cortes on
Hello LEED Community,
LEED O+M v4 Warehouses and Distribution Centers
posted by Ralph Bicknese on
We are evaluating utilizing LEED O+M for Warehouses and Distribution Centers for a 1.5M sf Distribution Center where the all parties are very interested in being able to achieve a LEED rating and r
Hiring - LEED Project Administrator
posted by Trisha Highnote on
Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR.
Mastic
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Michelle Lockert on
Can anyone tell me if it is okay to utilize mastic “outside” the building envelope?
Thank you.
View Type 1 with non-continuous window glazing
NC-v4 EQc8:Quality viewsposted by Edgar Arevalo on
I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous. The wall space between windows are a
"Weighted sum of non-roof and roof measures" Issue
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and roof area for 2 points."