Forum quick links
Access to Const credits while under Design Review?
posted by Renee Shirey on
In this updated format of LEED v3, can you access and upload information into Construction credits while a Design review is going on?
Three buildings, one garden
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Lawrence Lile on
We are developing a farmer's market. It will be associated with a community garden, which grows food for both the farmer's market and the local food bank.
Utility Renewable Portfolio Credit
NC-v4 EAc7:Green power and carbon offsetsposted by Brent Tokita on
My local utility has independent certification of it's current renewable portfolio, can this be credited against the Green Power percentage? e.g.
SSc2
NC-2009 SSc2:Development Density and Community Connectivityposted by Erika Duran on
I am working towards the SSc2 credit. Two buildings are currently under construction and floor and site area are unavailable. What should I do? Thanks, Erika
62MZCalc
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gordon Nielson on
I noticed, I cannot enter rooms that require exhaust like restrooms and lockers. Do I exclude them on the excel spread sheet?
Organic Fertilizer
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Andy Rhoades on
My landscaper is using a 100% Natural Organic component fertilizer with a ratio of 3-3-2.
Natural Ventilation on HAP
NC-2009 EAp2:Minimum Energy Performanceposted by Khaled Fouda on
Hey All, This question is basically for the energy modelers out there who use HAP or any other software. I have a conditioned lobby where the fan coil just uses the return air, according to our ca
500 miles or 100 miles?
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Becky Stumm on
In the credit language above, and corresponding LEED User calculator resource states manufacturing and distribution should be within 500 miles of the project, but my LEED EBOM v4 book from LEED say
colorants (for polished concrete floor) containing formaldehyde?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Debra a. Lombard on
we are a GC on a LEED NC v2009 project. we'll be doing both IAQ testing as well as a limited flush out, not nearly the Air exchanges for just doing flush out.
Multiple Points for One RPC
NC-2009 RPc1:Regional Priorityposted by Suzanne Johnson on
Water efficient landscaping is listed as an RPC in the database for a project. It states "WEc1 I Up to 4 Points".