Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Integrative Process Facilitator

NC-v4.1 IPc1:Integrative Process
posted by  Edward Reifenstein  on 

The Integrative Process credit for v4.1 BD+C: New Construction refers to an "Integrative Process Facilitator" who has responsibility for running the early charrette and tracking the results, u

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Feb 24, 2024, 2:22 pm

Minimum OA Options

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Courtney Mayes  on 

Hello,  I have a site that has a shared OAD for two units.  The duct is not large enough to supply the minimum OA, and one of the spaces have changed usage.  Even with reduced C

1
Sun Feb 25, 2024, 1:14 am

Are Sidewalks Required

NC-v4.1 LTc4:Surrounding Density and Diverse Uses
posted by  Alexandre Penegre  on 

We have a building that will be in the middle of a rural town. We easily meet the diverse uses within proximity, but there are no sidewalks.

3
Fri Feb 23, 2024, 1:32 am

Performing Commissioning Activities 3 years after occupancy

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Gaston Viau  on 

Hi!

Our NC-2009 project it's a 16,000sqf office building located in California.

5
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Feb 20, 2024, 8:01 pm

Envelope Description Reference - Using California Building Energy Efficiency Standard (Title 24) as reference?

NC-v4 EAp2:Minimum energy performance
posted by  Moses Chong  on 

Hi! I know that we have to describe the construction of the opaque envelope and reference the 90.1 Appendix A table in the minimum energy performance calculation.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Feb 14, 2024, 2:16 am

Baseline Heating Type with Campus Steam Humidification

NC-v4 EAp2:Minimum energy performance
posted by  Michael Hill  on 

I am modeling a lab builidng for LEED v4 and I am trying to determine what the Baseline heating type should be.

1
Tue Feb 13, 2024, 7:54 pm

Walk-in coolers and freezers

NC-2009 EAp2:Minimum Energy Performance
posted by  Vernon Smith  on 

I am modeling a 35,000 sf cafeteria that has seven walk-in coolers/freezers with total floor area of about 1700 sf. They are in the basement and first floor of the building.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Feb 13, 2024, 3:20 pm

beyond the 25 feet boundary and neighboring business

CI-v4 EQp2:Environmental tobacco smoke control
posted by  Edgar Arevalo  on 

There is a library project I'm working on which has a policy of no smoking within 100 feet from the entrance.  The thing is it is next to neighboring business that are are within the 100 feet

5
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Mon Feb 5, 2024, 4:44 pm

Is string lighting exempt from the Light Trespass/Uplight requirements.

NC-v4 SSc6:Light pollution reduction
posted by  Summer Gorder  on 

Hi, we have a project where they are using string lighting to light a pathway.

1
Sat Feb 3, 2024, 9:37 pm