NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Aaron McEwin on
With reference to LI #10209, I would appreciate clarification on the following: LI#10209:Applies only to mixed use building.What is defined as non-residential component per this interpretation? Wo
Flush out by AHU volume or Floor volume?
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Aru Sau on
In this project, there are three floors ( with multiple rooms with interior walls with doors) with multiple AHUs serving from 100% OA intake to 20% OA intake.
Building and Material Reuse
NC-v4 MRc1:Building life-cycle impact reductionposted by Edgar Arevalo on
I'm selecting Option 3 for building and material reuse.
Is there a occupancy % under 100% that is still considered 100%?
EBOM-2009 PIf3:Occupant and Usage Dataposted by Vanessa Seibert on
In our attempt to fill out PI form 3 we are recognizing that completing the form to note every time within 5 years that the 800,000 s.f.
Industry benchmark comparison reports
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Omar Delgado on
Greetings, I'm trying to find a benchmark comparison report for manufacturing plants but have had no luck so far.
EA Credit 1 Optimise Energy Performance - reaching criteria
CI-2009 IDc1:Innovation in designposted by Anna Brodersen on
Right now our project for an office building is en route to meeting the criteria of the updated LEED 2009 EA Credit 1 for optimising energy performance.
SS7.2 Design review comment
Schools-2009 SSc7.2:Heat island effect - roofposted by Michael Stills on
I received a reviewer comment requesting documentation to confirm which (standing seam metal roof) color was installed to verify the associated SRI values. Installed?
IAQ management plan-during construction or before occupancy
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Kali Wolin on
I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.
Reopening one path of LEED-CI SSc1.2 in Construction Review
CI-2009 SSc1:Site selectionposted by Susan Di Giulio on
In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.
Construction - Indoor Air Quality V2009
Schools-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Noelle Hunner on
Does the indoor air quality credit allow for propane powered lifts (inside the building) during construction? Or do they have to be battery powered only?