Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Shower Requirement for Leasing & Ammenity space of a Res.Bldg

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Aaron McEwin  on 

With reference to LI #10209, I would appreciate clarification on the following: LI#10209:Applies only to mixed use building.What is defined as non-residential component per this interpretation? Wo

1
Fri Nov 27, 2015, 2:26 pm

Flush out by AHU volume or Floor volume?

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Aru Sau  on 

In this project, there are three floors ( with multiple rooms with interior walls with doors) with multiple AHUs serving from 100% OA intake to 20% OA intake.

0

Building and Material Reuse

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Edgar Arevalo  on 

I'm selecting Option 3 for building and material reuse.

1
Sat Aug 26, 2017, 12:04 pm

Is there a occupancy % under 100% that is still considered 100%?

EBOM-2009 PIf3:Occupant and Usage Data
posted by  Vanessa Seibert  on 

In our attempt to fill out PI form 3 we are recognizing that completing the form to note every time within 5 years that the 800,000 s.f.

1
Mon Jan 26, 2015, 8:36 pm

Industry benchmark comparison reports

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Omar Delgado  on 

Greetings, I'm trying to find a benchmark comparison report for manufacturing plants but have had no luck so far.

1
Fri Jun 17, 2016, 7:07 pm

EA Credit 1 Optimise Energy Performance - reaching criteria

CI-2009 IDc1:Innovation in design
posted by  Anna Brodersen  on 

Right now our project for an office building is en route to meeting the criteria of the updated LEED 2009 EA Credit 1 for optimising energy performance.

1
Mon Jul 24, 2017, 3:04 pm

SS7.2 Design review comment

Schools-2009 SSc7.2:Heat island effect - roof
posted by  Michael Stills  on 

I received a reviewer comment requesting documentation to confirm which (standing seam metal roof) color was installed to verify the associated SRI values. Installed?

1
Tue Nov 24, 2015, 8:18 pm

IAQ management plan-during construction or before occupancy

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Kali Wolin  on 

I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.

1
Fri Jun 17, 2016, 12:42 am

Reopening one path of LEED-CI SSc1.2 in Construction Review

CI-2009 SSc1:Site selection
posted by  Susan Di Giulio  on 

In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.

1
Tue Jan 12, 2016, 3:32 pm

Construction - Indoor Air Quality V2009

Schools-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Noelle Hunner  on 

Does the indoor air quality credit allow for propane powered lifts (inside the building) during construction? Or do they have to be battery powered only?

1
Wed Jul 22, 2015, 4:38 am