Adhesive- expansion joints
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Stephanie Santiago on
Quick question on how to classify epoxy adhesive for expansion joints: The product data from the vendor, Emseal, states the VOC is 100 g/l, now which VOC limit do I use since these joints will be
Previously Developed AND Wetlands
NC-v4 LTc2:Sensitive land protectionposted by Becky Johnson on
My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.
LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed
NC-2009 IEQc2:Increased Ventilationposted by Todd Tewksbury on
Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd
Filter Replacement
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Andrew Ellsworth on
BACKGROUND: We have a project that is an office building pursuing LEED-CS 2009 certification. The C&S was substantially complete within the last several weeks.
Deadline for Construction Review
posted by M Bordeaux on
Is the cutoff of "(2) years past substantial project completion" for construction review submittal strictly enforced?
Overhead Vegetation
NC-v4 SSc3:Open spaceposted by Katherine Bachman on
I am looking for clarification on what is considered to be 'overhead vegetation.' Per the LEED v4 Reference Guide, "a minimum of 25% of outdoor space must be vegetated or have overhead vegetated c
Diverse Uses: Community Anchor Uses: Housing
NC-v4 LTc4:Surrounding density and diverse usesposted by Kevin Dunphy on
I am looking to pursue the Option 2 "Diverse Uses" method.
Hand Hygiene - Towel Dispensers
EBOM-2009 IEQp3:Green Cleaning Policyposted by Jeannie Rueter on
USGBC has a Green Cleaning Policy template in the Resources section of the Credit Library.
Line of sight at intersections
Pilot-Credits PC14:Walkable Streetsposted by Katie Peterschmidt on
Hello - has anyone had an issue with Requirement #9: where should the 50' tree spacing start from a busy intersection?
High Process Load and Equipment Efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by Shad Traylor on
Our project is a manufacturing plant which is seeking certification under NC Core and Shell v2009.