Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sara Zoumbaris on
Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.
New LEED building within existing LEED project site boundary
posted by Krissy Buck Flickinger on
I have a building registered under LEED NCv2009, that is being built entirely within the LEED boundary of a certified LEED NCv2.2 Gold project. Same owner.
Packaging?
NC-2009 MRc4:Recycled Contentposted by Caroline O'Leary on
Here's one I haven't seen and would love for people to weigh in on. A manufacturer of, let's say paint, has provided recycled content information but it's for the buckets their product comes in.
Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.
Existing HVAC system efficiency
CI-v4 EAp2:Minimum energy performanceposted by Richard Mathews on
Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.
Different equipment types or all equipment units in scope
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Edgar Arevalo on
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.
Daylight and Views - RP For Earning 1 Point For Just Daylight?
EBOM-2009 RPc1:Regional Priorityposted by Michelle Bracewell-Musson on
Hello, To earn EP, a project must earn 75% for Daylight AND 90% for Views. For Regional Priority, can it just be meeting the 50% of only DAYLIGHT, to earn the Regional Priority point?
Adhesive- expansion joints
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Stephanie Santiago on
Quick question on how to classify epoxy adhesive for expansion joints: The product data from the vendor, Emseal, states the VOC is 100 g/l, now which VOC limit do I use since these joints will be
Previously Developed AND Wetlands
NC-v4 LTc2:Sensitive land protectionposted by Becky Johnson on
My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.
LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed
NC-2009 IEQc2:Increased Ventilationposted by Todd Tewksbury on
Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd