Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

2-seat Reception Area in Middle School

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Sara Zoumbaris  on 

Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.

1
Fri Dec 5, 2014, 4:01 pm

New LEED building within existing LEED project site boundary

LEED Guidance for Campuses and Multiple Buildings
posted by  Krissy Buck Flickinger  on 

I have a building registered under LEED NCv2009, that is being built entirely within the LEED boundary of a certified LEED NCv2.2 Gold project. Same owner.

1
Thu Aug 17, 2017, 10:26 pm

Packaging?

NC-2009 MRc4:Recycled Content
posted by  Caroline O'Leary  on 

Here's one I haven't seen and would love for people to weigh in on. A manufacturer of, let's say paint, has provided recycled content information but it's for the buckets their product comes in.

1
Thu Mar 5, 2015, 12:39 am

Copy area in office - acoustical treatment

CI-v4 EQc9:Acoustic performance
posted by  Leticia SooHoo  on 

Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.

1
Thu Jan 19, 2017, 9:22 pm

Existing HVAC system efficiency

CI-v4 EAp2:Minimum energy performance
posted by  Richard Mathews  on 

Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.

1
Wed Jan 18, 2017, 11:51 pm

Different equipment types or all equipment units in scope

CI-2009 EAp3:Fundamental Refrigerant Management
posted by  Edgar Arevalo  on 

For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.

1
Wed Jan 18, 2017, 10:50 pm

Daylight and Views - RP For Earning 1 Point For Just Daylight?

EBOM-2009 RPc1:Regional Priority
posted by  Michelle Bracewell-Musson  on 

Hello, To earn EP, a project must earn 75% for Daylight AND 90% for Views. For Regional Priority, can it just be meeting the 50% of only DAYLIGHT, to earn the Regional Priority point?

1
Thu Mar 10, 2016, 4:08 am

Adhesive- expansion joints

Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Stephanie Santiago  on 

Quick question on how to classify epoxy adhesive for expansion joints: The product data from the vendor, Emseal, states the VOC is 100 g/l, now which VOC limit do I use since these joints will be

1
Fri Oct 3, 2014, 4:13 pm

Previously Developed AND Wetlands

NC-v4 LTc2:Sensitive land protection
posted by  Becky Johnson  on 

My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.

1
Thu Mar 3, 2016, 8:37 pm

LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed

NC-2009 IEQc2:Increased Ventilation
posted by  Todd Tewksbury  on 

Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd

1
Fri Jun 16, 2017, 7:33 am