Forum quick links
Secure Facilities
Schools-NC-v4 SSc8:Joint use of facilitiesposted by Lisa Logan on
Is it no longer a requirement to lock down parts of the building in order to meet this credit?
Running Exhaust Into Energy Recovery Wheel
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Neil Sen on
Are we allowed to run exhaust from areas like trash rooms into an energy recovery wheel and still achieve this credit?
Rainwater Management through BMP
NC-v4 SSc4:Rainwater managementposted by Jamé Wills on
I have an 8 acre site that is largely buildings and roadway, is it possible to achieve this credit with the use of French drain (exfiltration trenches)?
Bike Share Program
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jennifer Preston on
Since LEED came along many cities (DC, NYC,BOSTON) have now added bike share programs.
Restrictions on water retention due to Tidal Wetlands
NC-v4 SSc4:Rainwater managementposted by Pournamasi Rath on
Hi,
Modular and Panelized construction
Mid-Rise-v4 MRc3:Construction waste managementposted by Michael Browne on
How should recycled and total waste be calculated and documented for v4 LEED Homes Midrise projects with off-site construction such as panelized walls, trusses, and modular projects?
Option 3 - Core Performance Guide???
NC-v4 EAp2:Minimum energy performanceposted by Erica Downs on
The prescriptive path under Option 3 still references the "Advanced Buildings Core Performance Guide". However, this guide has been "sunset" by NBI and no longer exists. Typic
Gas vented fireplace
NC-2009 EAp2:Minimum Energy Performanceposted by Carlos Vazquez on
I have a project were there is a 24,000 Btuh gas vented fireplace. Is a wall device mostly radiant heater (70-75%) with a glass panel which does not have a fan.
LDP for EBOM Recertification - Pros and Cons?
posted by Kimberlee Dobbins on
I know of one building attempting to use LDP for EBOM recertification. Has anyone successfully achieved recertification and willing to share the experience?
Maintenance Garage Baseline System
NC-2009 EAp2:Minimum Energy Performanceposted by Keith Lane on
I'm hoping someone can help me determine the appropriate Baseline system for a Vehicle Maintenance Facility for a LEED v2009 project. The total project area is about 34,500 s.f.