Schools: Shop-applied primers
Schools-NC-v4 EQc2:Low emitting materialsposted by Philip Kabza on
Previous restrictions on content of shop-applied primers (such as on structural steel), that were put on hold in v3, appear to not have carried forward at all in v4. Am I correct?
When to perform the waste audit?
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Summer Minchew on
LEEDuser guidance clearly states that the waste audit should be performed during the Performance period.
glass paint & SCAQMD Rule #?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Debra a. Lombard on
Hi, we are a GC on a LEED NCv2009 project & need to paint some interior glass. I'm trying to confirm the VOCs the paint/coating needs to comply with.
Reviewers are not paying attention
NC-v4 SSc6:Light pollution reductionposted by Bill Swanson on
Just got the review comments back on a project.
For Uplight, Option #1 was selected. BUG rating of fixtures was provided.
Average Weekend Trips
NC-v4 LTc5:Access to quality transitposted by Brendan Isard on
We have a project which a bus line provides (15) trips on a Saturday and (11) trips on a Sunday, with an average of (13) trips between the (2) days. The credit language states that an average
Utility Bills for REC Green Power Calculations...
NC-2009 EAc6:Green powerposted by Rick Alfandre on
The link below, fromLEEDuser, indicates that if you can use actual utility bills x 50% x 2 yrs to calculate the required quantity of RECs as opposed to the EAc1 energy model design consumption x 35
Amtrak and Megabus
NC-v4 LTc5:Access to quality transitposted by Sara Zoumbaris on
Our project is shy of the second weekend trip threshold (108) by 1-ride. We are within walking distance of Amtrak, which has regularly scheduled pickups at our location twice a day.
Existing building curtainwall reduced glazing %
NC-v4 EAp2:Minimum energy performanceposted by Wade Cooper on
I have an existing envelope that is a complete curtain wall assembly that is to be replaced. The overall WWR for the building is over 70% currently and is being removed and redesigned to
Gross area v. net area in PI Form 3 and IEQ8.1
NC-2009 PIf3:Occupant and Usage Dataposted by James Bell on
PI Form 3 requires gross area of Occupied Space.
Owner Provided Signage
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Summer Minchew on
I have a project that will have owner provided signage (naming signage) mounted to architectural canopies.