Forum quick links
Building Products dont meet credit requirements?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Emily Neal on
Our project is registering under V4-CI. We are having difficulty with the MR credits where it requires 20 different products, our project doesn't have 20 products to use.
Controllability of lighting in Stadiums / Arenas
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Stacey Olson on
I'm working on a project (2009 BD&C) that includes an outdoor open air stadium, and indoor facilities that include restrooms, circulation, concessions, team locker rooms, press rooms, etc. I r
Occupant Comfort Survey for residential projects?
NC-v4 INc1:Innovationposted by Erica Downs on
Under v3, residential projects were ineligible for this credit. Does anyone know if they are eligible under this v4 Innovation credit? Thanks!
How to divert 70% of ongoing consumables?
EBOM-v4 MRc4:Solid waste management - ongoingposted by David Baker on
I have a project that is up for recertification next year and wants to pursue the MR credit for diverting ongoing consumables.
Preschool Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Heather Holdridge on
I received a preliminary design phase review comment on a preschool project for this PI form. We entered identical values for the peak and average transient occupancy because the building is
repositioned non-historic building in a historic DISTRICT
CS-v4 LTc3:High priority siteposted by Gail Napell on
we're renovating a NON-HISTORIC building in a HISTORIC district. new façade, new MEP systems, structural upgrades. Does this meet the intent of Option 1?
NC-v4 MRc5 Option 2: Clarification of floor area for multi-phase renovation project.
NC-v4 MRc5:Construction and demolition waste managementposted by Yasha Ogg on
I am working on a multi-phase project and I was wondering, does Option 2: Reduction of total waste material (Do not generate more than 2.5 pounds of construction waste per square foot of the b
Area not in scope of project
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Carl Rappa on
We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2.
Historic District
NC-v4 LTc3:High priority siteposted by Ashlen Williams on
Our project site is determined to be eligible for the National Register of Historic Places. Does this eligibility satisfy the requirement? Thanks in advance for your feedback.