Report multiple electric meters on Energy Star Portfolio Manager

NC-2009 PIf1:Minimum Program Requirements
posted by  Edward Gulick  on 

I am (finally) wrapping up documentation on a multi-tenant building.  It is a LEED-NC project because over 50% of the leaseable space is owner-occupied.  The building has 4 electric

1
Mon Apr 2, 2018, 4:38 pm
4
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Mar 30, 2018, 2:50 pm

Documentation for Material Reuse?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Megan White  on 

What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove.

3
Thu Mar 29, 2018, 4:19 pm

LEED ID+C CI commercial Interiors v4 water calc credit

CI-v4 WEc1:Indoor water use reduction
posted by  Robert Fernandez  on 

A little confused on this aspect of the credit....I was told buy a colleague that this credit can only apply to newly installed fixtures? and not base building restrooms that were not modified?

1
Thu Mar 29, 2018, 1:50 pm

Option 2 site area

CS-v4 SSc2:Site development - protect or restore habitat
posted by  Gail Napell  on 

Hi all

just confirming this is literally based on site area -i.e. our site is very small, so the cost is proportional. Thank you!

0

Credit for minimizing hardscape

NC-v4 SSc5:Heat island reduction
posted by  Bret Mantyk  on 

Is there anyway to claim credit for having a lot of vegetated landscapes on a project - which meets the intent of reducing heat islands?

1
Wed Mar 28, 2018, 3:30 pm

Building reuse, as part of a larger project.

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Erica Downs  on 

Our project is reusing a non-historic, un-abandoned building, as part of a much larger project.

3
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Wed Mar 28, 2018, 12:41 am

Location Limitations

Pilot-Credits SSpc82:Local food production
posted by  Kath Williams  on 

LEED for Schools O&M v4 project.  This small rural school borders Yellowstone National Park.

0

Multiple School Additions and Determining LEED Boundary

Schools-NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Stephen Sgro  on 

We are currently working on a school project that includes four additions to be constructed over several phases.

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Mon Mar 26, 2018, 9:29 pm

When to redo the ashrae energy audit for a re-certification.

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Richard Klein  on 

When reading through the LEED re-certification guidelines it states that an ASHRAE energy audit must be done once every 5 years, however, it also states that the performance period is between

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Mar 26, 2018, 9:10 pm