Forum quick links
Option 2 HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Aaron Wintersmith on
The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."
Hotel mix use
NC-v4 EAp2:Minimum energy performanceposted by jefferson thomas on
We have a hotel with 4,000 SF of retail at the lower level of a new construction hotel project? How do we sepperate the two projects if they have a central energy plan for chilled water?
Exclusions from Regularly Occupied Spaces for Lab Spaces
CS-v4 EQc4:Daylightposted by Jordan Daniels on
I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor).
Eco-Friendly worksafe solvents
posted by Robert Marsh on
Removing dust, dirt, allergens, and infection-causing agents like viruses is a key component of a healthy indoor environment and doing it in a Eco-friendly way is best of all the techniques.
Oops - broken chain of custody wood classification?
Pilot-Credits MRpc102:Legal Woodposted by Joanna Switzer on
Discovered in a project a little too late that FSC doors are being procured /handled by a non-FSC U.S.
Project registration
NC-v4 MPR1:Must be in a permanent location on existing landposted by Kavita Karmarkar on
I am posting this here as this question is not really applicable to any credits / MPR.
Is there a hard cut-off to when a project can register for LEEDv4 New Construction?
Possible innovation point / contact USGBC
NC-v4 INc1:Innovationposted by Kavita Karmarkar on
Hello all,
Conference Room vs. Meeting Room / Sliding doors
NC-v4 EQc9:Acoustic performanceposted by Kavita Karmarkar on
Hi everyone,
Applying IPpc90 beyond BD+C projects
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Alicia Daniels Uhlig on
Has anyone pursued this credit on a LEED for Homes Multifamily Midrise v2010 project?
Occupancy Calculations in LEEDv4
NC-v4 MPR3:Must comply with project size requirementsposted by Arathi Gowda on
In the new simplified Project Information forms there is no longer a calculator for FTE counts. Are teams using the historic v3 calculators to estimate FTE (along with the baked in assumptions)?