Option 2 (prescriptive path) documentation?

NC-v4 EAp2:Minimum energy performance
posted by  Erica Downs  on 

I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG.  The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems

1
Wed Aug 28, 2024, 7:34 pm

Option 1 Lighting Control - Undeveloped Future Tenant Spaces

NC-v4 EQc6:Interior lighting
posted by  James Keohane  on 

I am working on a project that has the majority of individual occupant spaces that will be completely finished with lighting controls meeting the requirements for Option 1.  However, we a

2
Senior Sustainability Specialist
Jacobs
LEEDuser Premium Member
0 thumbs up
Fri Aug 9, 2024, 1:13 pm

Base Building Supplying Racks

CI-v4 LTc4:Bicycle facilities
posted by  Jane Christen  on 

We're working on a LEEDv4 Commercial Interiors project in Seattle, WA. Does it matter if the base building is supplying the short term bicycle racks?

4
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Wed Aug 7, 2024, 8:00 pm

Water Fountain / Bottle Filler + Wash Fountain Classifications

NC-v4 WEc2:Indoor water use reduction
posted by  Cammie Epstein  on 

1) Does a water fountain / bottle filler not count towards indoor water use? There's no option to list them under flow fixtures in the calculator. What am I missing?

1
Mon Sep 2, 2024, 7:55 pm

Can you add credits after a LEED Construction Preliminary

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Summer Gorder  on 

We would like to add new credits that we did not originally submit for in our LEED Construction Prleominary review. Will the reviewer add the newly attempted credits?

 

1
Tue Aug 6, 2024, 12:34 am

Additions

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Lorax Partnerships  on 

Our project is an addition built into the crotch of an L-shaped building.

0

Project in a resort attached to casino that allows smoking

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Anna Kaelin  on 

I have a client planning a complete fit-out of one of their retail spaces. The project is located in a resort in Las Vegas, which is attached to a Casino that allows smoking.

4
Default Avatar
Green building manager
Confidential
LEEDuser Basic Member
13 thumbs up
Mon Aug 5, 2024, 12:36 pm

Single LEED building in Zoo: Demand Response Plan required for entire Zoo?

NC-v4 EAc4:Demand response
posted by  Joyce Kelly  on 

Wondering if the Demand Response Plan needs to address the entire Zoo the way Parking, Green Vehicles credits must.

1
Wed Jul 31, 2024, 9:26 pm

Including space in the the project boundary where only one trade is included in scope

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Edgar Arevalo  on 

I have an ID+C project that takes up approximately half of a floor in a building.  When laying out the LEED project boundary, I was confused as to whether to include the restrooms, since it wa