Forum quick links
Should we track quantity and costs for profiles and caps/wall base moldings ?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Priscillia Champagne on
I am wondering if edging profiles (like Schluter systems let's say) as well as wall base caps and moldings (like Tarkett finishing accessories) need to be tracked for the Flooring Category.
Electric vehicles charging stations
CS-v4 EAc2:Optimize energy performanceposted by Rihab Joucht on
I want to make sure if we include the EV charging in Energy Model ? As mentionned in 10499 - EV Charging in Model | U.S.
Downstream Implementation of Analysis Outcomes
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Charles Boechler on
This is such a critical part of informing plan decisions in relation to the marketplace value or buyer acceptance.
Seed Evaluator Tool Effectiveness?
Pilot-Credits IPpc89:Social equity within the communityposted by Charles Boechler on
Is the Seed Evaluator the best tool for measuring social equity?
Relevant Trades/Contractors at Project Planning Stage
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Charles Boechler on
From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key individ
Appendix 2. Default occupancy counts
NC-v4 LTc6:Bicycle facilitiesposted by Eslam Elshorbagy on
Hi,
Carbon offset Canada
NC-v4 EAc7:Green power and carbon offsetsposted by Julie Hardy on
Hello,
I am looking to get carbon offsets for a projet in Quebec. Do you know any good Canadian carbon offsets company that is affordable and meets the requirements?
Non-occupied Garage - Flush required?
NC-v4 EQc4:Indoor air quality assessmentposted by Leanne Conrad on
If we have a separaetly HVAC served storage garage that is quite large and mimininally heated, does this area have to be included in the whole building flush and maintain the higher than normal tem
Advanced Metering NC Space Exemptions
NC-v4 EAc3:Advanced energy meteringposted by Alexandra Markus on
I'm working on a recreation center project that includes a daycare. The daycare space will not be fit-out as part of the project.
Flooring Weld Rods: Document in which category?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Jason Packer on
Hello Leedusers,