Forum quick links
Establishment period for 50% landscape water use reduction
NC-2009 WEc1:Water Efficient Landscapingposted by Dimuth Kurukulaarachchi on
All mention of establishment periods refer to the no potable water/irrigation case (WEc1 Option 2), but what about for Option 1, 50% non-potable water use reduction?
Recent toilets, old building
CI-v4 WEc1:Indoor water use reductionposted by Erika Roy on
Hello,
We are working on a CI project that changed the toilets only few years ago with 6lpf. Less than 3 years.
Achieving credit in a Rest Area
NC-v4 LTc7:Reduced parking footprintposted by Julie Hardy on
The provincial government is designing a Rest Area for an important Highway, the project will also is to be operated and owned by the provincial government.
SSp2 Ruling based on Risk Assessment
Healthcare-v4 SSp2:Environmental site assessmentposted by Donal Dignan on
Hi All, I'm working on a Healthcare v4 project that has detected iron in significant concentrations on the project site and it appears to possibly be a background contaminate but this is still bein
Exterior Noise Monitoring - Rural Roads
Schools-NC-v4 EQp3:Minimum acoustic performanceposted by Leanne Conrad on
In building a rural school, our address is technically a highway (HWY 25 to be exact).
Dual Flush Flow Rate
NC-v4 WEp2:Indoor water use reductionposted by Leanne Conrad on
We have a product data sheet for a dual flush toilet that states 6L/3L with an effective flush volume of 4L.
Base ratios for hospitals
Healthcare-v4 LTc7:Reduced parking footprintposted by Donal Dignan on
I'm working on a hospital project which qualifies as Case 2 (although it's not urban and qualifies by way of diverse uses only) for this credit and am trying to work out the base ratio of parking s
Landscaped area on a podium
NC-2009 WEc1:Water Efficient Landscapingposted by Lindsay Duthie on
My project consists of some landscaping at grade (2%) and the majority of landscaping on the podium level (18%) for a combined landscaped area that is about 20% of the site.