Forum quick links
Reclaim and use steam condensate requirement for indoor water use reduction
NC-v4 WEc2:Indoor water use reductionposted by Elyse Dufrene on
Can you please clarify what is ment by the requirement for steam system : reclaim and use condensate - 100% recovery and reuse. Tks
Connectivity within a Big Box Store Shopping Centre
ND-v4 SLLc1:Preferred locationsposted by Tim Nabholz on
What is considered an intersection within a parking lot of a Big Box Store shopping centre.
Does IT and AV equipment need to be installed prior to IAQ testing?
CI-v4 EQc4:Indoor air quality assessmentposted by Diana Smiciklas on
Does IT and AV equipment need to be installed prior to IAQ testing? We are moving offices and our IT team will be dismantling and reinstalling AV and IT equipment the weekend prior to our move.
Appendix G system type for addition
NC-2009 EAp2:Minimum Energy Performanceposted by Hilary Giffen on
I have an addition to a manufacturing plant. The addition has its own HVAC system so the LEED boundary encompasses just the addition.
No cooling tower in design but core and shell spaces modeled as neutral with cooling tower in energy model.
Pilot-Credits WEpc94:No Cooling Towerposted by Chris Yates on
A project I am working on meets all the requirements for the design (no cooling tower, no use of the latent heat of the evaporative cooling of water, no cooling from a Dist
Lighting control for presentation in meeting room
NC-v4 EQc6:Interior lightingposted by Elyse Dufrene on
LEED requirement says that Lighting for any presentation or projection wall must be separately controlled.
Pooled Parking Calculation
NC-v4 SSc5:Heat island reductionposted by Keith Robertson on
We have a project on a university campus that uses pooled parking.
Achieving the certified level to earn RP credit points?
NC-v4 RPc1:Regional priorityposted by Manuelle Croft on
With the LEED Canada 2009 versions, projects had to achieve the certified level prior to ean the Regional priority credit (RPc)points.