Forum quick links
LEED ND v4 Pilot Credit Integrative Process - Participation in the Forum
ND-Plan-v4 INc1:Innovationposted by Charlotte Bodnar on
As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification.
LEED ND v4 Pilot Credit Integrative Process - Participation in the Forum
Pilot-Credits IPpc101:Integrative Processposted by Charlotte Bodnar on
As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification.
Construction Activity pollution prevention inspections
NC-v4 SSp1:Construction activity pollution preventionposted by Irene Carreno on
Hello. I am working in a project that has the Erosion and control plan following the CGP 2012(LEED V4) , part of the plan is to have weekly inspections on site to review how the erosion and control
Total Building Energy Use
EBOM-v4.1 EAp3:Energy Performanceposted by Ben McEwen on
Regarding, EAc1, does it need to include non essential equipment that is on a sub-meter?
ASHRAE Level 1 Energy Audit
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Ben McEwen on
Regarding the Energy Audit Prerequisite, is there an acceptable age range for a pre-existing energy Audit that was conducted on the building in question?
UL/Ecologo category 2794 for certified disinfectants not listed in the recommended products??
EBOM-v4 EQp3:Green cleaning policyposted by Martine Menard on
Why is UL/Ecologo category 2794 (for disinfectants) NOT LISTED in the recommended products to be used??? Is this a mistake? enduser is asking to get an approved disinfectant …..help.
BOD review from the BECx consultant
NC-v4 EAc1:Enhanced commissioningposted by Julie Trottier on
Good Morning,
Fixtures for Option 2 Lighting Quality, Strategy D.
NC-v4 EQc6:Interior lightingposted by Geoffrey Katz on
A recessed LED troffer type fixture may have an indirect light component by way of internal reflectors that reflect upward-directed light within the fixture back down onto the space below.
Ending ESC Monitoring - what stage in construction?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by David Bell on
Hi, I'm curious whether the USGBC/CaGBC has a generally accepted endpoint to ESC monitoring on a construction project, or whether it is left to professional judgement. I.e.