Forum quick links
Pressurized entryway vestibules at high-volume building entrances
Healthcare-v4 EQc1:Enhanced indoor air quality strategiesposted by Priscillia Champagne on
Hi, I would like to know if there is additional guidance on the requirement to provide pressurized entryway vestibules at high-volume building entrances.
100% greenfield site admissibility
NC-v4.1 SSc2:Protect or Restore Habitatposted by Carla Rincon on
Hello everyone,
What consultants are included in a design contract?
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Rebecca Holt on
Can anyone confirm what consultants should be included in the design contract?
Existing fixture with no data available
CI-v4 WEp1:Indoor water use reductionposted by Julie Hardy on
Hello,
Diesel Fuel Used for Sprinkler Water Pump House
Warehouses-NC-v4 EAp3:Building-level energy meteringposted by Laura Long on
Good day! We are working on a large warehouse facility that requires a large, 20' tall pump house to support a sprinkler system. It will run on diesel fuel. With this fuel ne
Split System AC in an existing building
NC-v4 EAc6:Enhanced refrigerant managementposted by Charles Marshall on
We are working on a major renovation project that contains several split system AC units which will be replaced. The owner doesn't have any record of the refrigerant volume that was charged f
Heat Island Reduction - vegetated surface - modular systems
NC-v4 SSc5:Heat island reductionposted by Ricardo Hernandez on
Hi Forum, can anyone confirm that a modular vegetated systems (plastic modules with ecomembrane, above ground) can count on the calculations for the vegetated surface, i would like to implement a r
SS Credit: Heat Island Reduction - Tree Equity for International Projects
posted by Adam Stoker on
I have some concerns with the proposed approach to 'Tree Equity' for international projects.
Number of seating spaces vs wheelchair space
Healthcare-v4 SSc7:Places of respiteposted by Priscillia Champagne on
Credit language :