Forum quick links
Number of Commissioning Agents
posted by Dola Onajin on
Is it okay to have more than one independent commissioning agent on a project?
Non-electric and electric energy use for the Renewable Energy credit version 4.1
CI-v4.1 EAc4:Renewable Energyposted by Ana Maria Escobar Cardenas on
Hello!
How many units needed for air testing.
Mid-Rise-v4 EQc2:Contaminant controlposted by Jillian Hansen on
I am working on a project that has one ventilation system and each of the 6 floors are less than 25,000SF.
SSc4 Surveying Staff Throughout Building
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Alexis Doyle on
Hello,
Management Plan Addressing How Pollution and Eutrophication of Waterways Would Be Minimized through Operational Changes
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Sandra Lester on
We have been asked by the CaGBC to provide a management plan addressing how pollution and eutrophication of waterways would be minimized through operational changes.
Shared Parking Spaces and Existing EV Charging Stations on University Campus
NC-v4 LTc8:Green vehiclesposted by Ashley Hu on
Hi everyone,
Borrowing credit from Homes Design and Cronstruction
NC-v4 EAc5:Renewable energy productionposted by Michael J Turner on
Hello,
We are using LEED V4 BD+C, and we achived a credit listed within the LEED Homes Design and Construction; specifically the EA Credit: Active Solar-Ready Design.
Insulation calculation by surface area
NC-v4.1 EQc2:Low-Emitting Materialsposted by Marie-Christine Morin on
Hi all,
Appendix 2: Default Occupancy Counts
NC-v4 WEc2:Indoor water use reductionposted by Elizabeth Hand on
I am working on a Community Center that has been registered for LEED BD+C NC.
Appendix 2: Default Occupancy Counts
posted by Elizabeth Hand on
I am working on a Community Center that has been registered for LEED BD+C NC. The occupancy estimate of our project is currently unknown, and I am unable to reference a default occup