Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

FAR of a retail unit within a Multi-Use Building

ND-Plan-v4 NPDc2:Compact development
posted by  Tim Nabholz  on 

Is there another way to count the FAR of retail in multi-storey building with residential above?

1
Mon Sep 28, 2020, 11:27 pm

Number of Commissioning Agents

LEED Canada Forum
posted by  Dola Onajin  on 

Is it okay to have more than one independent commissioning agent on a project?

0
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Tue Sep 15, 2020, 5:24 pm

How many units needed for air testing.

Mid-Rise-v4 EQc2:Contaminant control
posted by  Jillian Hansen  on 

I am working on a project that has one ventilation system and each of the 6 floors are less than 25,000SF.

0
2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Jun 16, 2020, 6:40 pm

Management Plan Addressing How Pollution and Eutrophication of Waterways Would Be Minimized through Operational Changes

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Sandra Lester  on 

We have been asked by the CaGBC to provide a management plan addressing how pollution and eutrophication of waterways would be minimized through operational changes.

0
4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Sat May 23, 2020, 9:06 am

Borrowing credit from Homes Design and Cronstruction

NC-v4 EAc5:Renewable energy production
posted by  Michael J Turner  on 

Hello,

We are using LEED V4 BD+C, and we achived a credit listed within the LEED Homes Design and Construction; specifically the EA Credit: Active Solar-Ready Design.

1
Mon May 18, 2020, 2:26 pm

Appendix 2: Default Occupancy Counts

NC-v4 WEc2:Indoor water use reduction
posted by  Elizabeth Hand  on 

I am working on a Community Center that has been registered for LEED BD+C NC.

1
Fri Apr 9, 2021, 6:32 am