Forum quick links
Verified Construction & Demolition Recycling Rates Pilot
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Juliana Moreira on
I am working on a commercial interiors project in London-UK. The standard for construction waste most commonly used in the UK is the PAS 402.
Energy Modelling - United Kingdom
NC-v4 EAp2:Minimum energy performanceposted by Fleur Baguley on
Hi, I have a project in the UK. For schemes such as BREEAM we use a SBEM - BRUKL output for the energy credits. Does anyone know if this is compliant to use for LEED as well?
Elevators
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
I have managed to create a rather impressive energy reduction between the baseline and proposed elevators.
EAc1 baseline and proposed systems
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
The problem I am having is that I have to select a system for the baseline model which is System 7 VAV with Reheat, based on the advise of ASHRAE Table G3.1.1A , however the proposed system for the
Non-smoking signage requirement / location for LEEDv4 CI
CI-v4 EQp2:Environmental tobacco smoke controlposted by Meike Borchers on
Hi, we are looking at LEEDv4 CI for a project in London.
LAB21
EBOM-v4 EAp2:Minimum energy performanceposted by Ivan Blazevic on
Can a project (with adeqaute proportion of lab area) located in the United Kingdom benchmark its performance against Lab21 tool data?
Visitor parking only
CI-v4 LTc5:Reduced parking footprintposted by Karen Elliott on
We have an large office space in Central London that has 2 car parking spaces, but the staff will not be able to use them. They will only be used in exceptional circumstances for visitors.
Understanding LEED Online V4?
posted by Susannah Goddard on
Hi, Wondered if anyone can point me in the direction of any useful guidance which helps explain what is what on the new LEED Online?
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.