Indoor plants planted in the ground
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Albert Sagrera on
Good afternoon, We are analyzing a building that in addition to having an outside green area and a green roof, will also have plants planted in the ground inside the building, without flowerpots.
OCCUPANCY TO CALCULATOR
Warehouses-NC-v4 WEc2:Indoor water use reductionposted by Helena Garcia on
Dear Leed users, We are doing a warehouse project in Spain.
Credit Complance/Justification in Spanish
posted by Peter Gibney on
For justifiying compliance with LEED credits for a Project in Spain, can supporting documentation, management plans, etc.
FTE - Healthcare buildings
Healthcare-v2009 PIf3:Occupant and Usage Dataposted by VICTOR MORENO on
In our Healthcare project, there are workers during the morning, afternoon and evening, with a time of 8 hours each. if I count the FTE, I get a total of workers greater to the number of workstati
Facilities and alterations. Outside the building
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Mercè Llorca on
There are outside works planned to be done.
Prohibit Smoking Signage in entrance of Parking and loading docs
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Mercè Llorca on
Even though there is a post over this ítem I am not really sure about this two áreas and the need of signage. In our builiding there are 4 entrances to the underground car park.
Lots and open space question
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Albert Sagrera on
Hello, We are wondering if a future building occupying two different plots can be considered as a single LEED project or not. In the case that it is considered as a single project, as it affects
Additional Enhanced IAQ Strategies
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Marina Curto on
In this credit, two options are available, Options 1 and 2. Can a project achieve Option 2 only without pursuing Option 1?
Error in eQUEST in the Perform Compliance Analysis
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, I am stuck with an error from eQUEST.
Logistic Warehouse
NC-v4 EQc7:Daylightposted by Helena Garcia on
Our project is a logistic warehouse which is divided into two buildings.