Forum quick links
Requirements of section 5.4.3.4 of ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Maurizio Sabatino Pirocchi on
Hi,
I have a question concerning requirements of section 5.4.3.4 of ASHRAE 90.1-2007.
U-values for mixed-use building
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For the baseline model relative to a building where a part is residential (4 floors) and another part nonresidential (ground floor), shall the envelope of the nonresidential part respect the U-valu
Hz for mandatory provisions for fans
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In order to verify whether a fan is compliant with the mandatory provisions we have to consider Table 10.8B, haven't we?
Water Coil Sizing, heating and cooling
NC-v4 EAp2:Minimum energy performanceposted by Giuseppina Amorusi on
Hi all! I have a problem with water coil sizing. I set the following parameters for cooling and heating:
ventilation chimneys for buffer space
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
The corridors are separated from the staircase by two doors in order to create a space (buffer space) whose walls and doors are fire-resistant.
ASHRAE 90.1-2010 - Unmet hours
CS-v4 EAp2:Minimum energy performanceposted by Giuseppina Amorusi on
Hi all,
I’m modeling for a project under LEED CS v4 according to ASHRAE 90.1-2010.
I know that unmet hours shall not exceed 300 .
step controls per Section 9.4.1.2a
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
The v4_Minimum Energy Performance Calculator_v05 states that "Mandatory step controls are included in the proposed, and modeled in the baseline for all spaces enclosed by ceiling height partitions
DES Path 1
NC-v4 EAc7:Green power and carbon offsetsposted by Francesco Passerini on
The Reference Guide at p. 460 states:
"For any projects using energy model Path 1, green power and offsets used in a DES do not contribute toward the credit for connected building".
renewable energy sold to the grid
NC-v4 EAc2:Optimize energy performanceposted by Francesco Passerini on
In order to calculated the points relative to NC-v4 EAc2 - Optimize energy performance shall the produced electric energy from a renewable source that is sold to the national gri
Daylighting controls for primary sidelighted areas for baseline
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In the refurbishment that was designed internal partitions will be removed and the rooms will become bigger than the existing ones.