Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

U-values for mixed-use building

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

For the baseline model relative to a building where a part is residential (4 floors) and another part nonresidential (ground floor), shall the envelope of the nonresidential part respect the U-valu

1
Tue Apr 10, 2018, 3:26 pm

Hz for mandatory provisions for fans

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

In order to verify whether a fan is compliant with the mandatory provisions we have to consider Table 10.8B, haven't we?

3
Thu Mar 22, 2018, 3:39 pm

Water Coil Sizing, heating and cooling

NC-v4 EAp2:Minimum energy performance
posted by  Giuseppina Amorusi  on 

Hi all! I have a problem with water coil sizing. I set the following parameters for cooling and heating

 

4
Thu Mar 8, 2018, 2:50 pm

ventilation chimneys for buffer space

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

The corridors are separated from the staircase by two doors in order to create a space (buffer space) whose walls and doors are fire-resistant.

3
Mon Mar 5, 2018, 8:38 pm

ASHRAE 90.1-2010 - Unmet hours

CS-v4 EAp2:Minimum energy performance
posted by  Giuseppina Amorusi  on 

Hi all,

I’m modeling for a project under LEED CS v4 according to ASHRAE 90.1-2010.

I know that unmet hours shall not exceed 300 .

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Mon Mar 5, 2018, 3:53 pm

step controls per Section 9.4.1.2a

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

The v4_Minimum Energy Performance Calculator_v05 states that "Mandatory step controls are included in the proposed, and modeled in the baseline for all spaces enclosed by ceiling height partitions

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 15, 2018, 8:15 am

DES Path 1

NC-v4 EAc7:Green power and carbon offsets
posted by  Francesco Passerini  on 

The Reference Guide at p. 460 states:

"For any projects using energy model Path 1, green power and offsets used in a DES do not contribute toward the credit for connected building".

2
Wed Feb 14, 2018, 5:33 pm

renewable energy sold to the grid

NC-v4 EAc2:Optimize energy performance
posted by  Francesco Passerini  on 

In order to calculated the points relative to NC-v4 EAc2 - Optimize energy performance shall the produced electric energy from a renewable source that is sold to the national gri

3
Mon Feb 12, 2018, 8:01 pm

Daylighting controls for primary sidelighted areas for baseline

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

In the refurbishment that was designed internal partitions will be removed and the rooms will become bigger than the existing ones.

1
Mon Feb 5, 2018, 5:50 pm

Community contaminant prevention - Airborne Releases

NC-v4 INc1:Innovation
posted by  alessandro santuari  on 

Greetings,
I wanted to ask if this credit is also valid for a trigeneration plant.

1
Sat Feb 3, 2018, 12:26 am