U-values for mixed-use building
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For the baseline model relative to a building where a part is residential (4 floors) and another part nonresidential (ground floor), shall the envelope of the nonresidential part respect the U-valu
Hz for mandatory provisions for fans
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In order to verify whether a fan is compliant with the mandatory provisions we have to consider Table 10.8B, haven't we?
Water Coil Sizing, heating and cooling
NC-v4 EAp2:Minimum energy performanceposted by Giuseppina Amorusi on
Hi all! I have a problem with water coil sizing. I set the following parameters for cooling and heating:
ventilation chimneys for buffer space
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
The corridors are separated from the staircase by two doors in order to create a space (buffer space) whose walls and doors are fire-resistant.
ASHRAE 90.1-2010 - Unmet hours
CS-v4 EAp2:Minimum energy performanceposted by Giuseppina Amorusi on
Hi all,
I’m modeling for a project under LEED CS v4 according to ASHRAE 90.1-2010.
I know that unmet hours shall not exceed 300 .
step controls per Section 9.4.1.2a
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
The v4_Minimum Energy Performance Calculator_v05 states that "Mandatory step controls are included in the proposed, and modeled in the baseline for all spaces enclosed by ceiling height partitions
DES Path 1
NC-v4 EAc7:Green power and carbon offsetsposted by Francesco Passerini on
The Reference Guide at p. 460 states:
"For any projects using energy model Path 1, green power and offsets used in a DES do not contribute toward the credit for connected building".
renewable energy sold to the grid
NC-v4 EAc2:Optimize energy performanceposted by Francesco Passerini on
In order to calculated the points relative to NC-v4 EAc2 - Optimize energy performance shall the produced electric energy from a renewable source that is sold to the national gri
Daylighting controls for primary sidelighted areas for baseline
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In the refurbishment that was designed internal partitions will be removed and the rooms will become bigger than the existing ones.
Community contaminant prevention - Airborne Releases
NC-v4 INc1:Innovationposted by alessandro santuari on
Greetings,
I wanted to ask if this credit is also valid for a trigeneration plant.