Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Suburban achieving SSc2

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Martin Meehan  on 

The credit language states that projects in Urban areas achieving SSc2 can contribute with green roof/pedestrian oriented hardscape. Are projects in Suburban areas achieving SSc2 allowed to do so?

1
Thu Apr 7, 2016, 2:07 am

Core and Shell project with public bike scheme adjacent

CS-v4 LTc5:Access to quality transit
posted by  Sean Hogan  on 

Our project seeking C&S certification for and existing building redevelopment.

1
Tue Jan 17, 2017, 9:47 pm

EA Prerequisite Minimum Energy Performance

EBOM-v4 EAp2:Minimum energy performance
posted by  Jordan Kirrane  on 

I'm currently completing the form for the above prerequisite to achieve the credit for EA Credit Optimize Energy Performance under Case 2, Option 2.

1
Tue Mar 29, 2016, 4:00 pm

LEED v3 Campus Deadline

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Patrice McVeigh  on 

We are working on a project with 4 office buildings and a multi-storey car park. We are unsure whether to go for campus certification as the project is phased.

1
Fri Nov 18, 2016, 5:20 pm

Retail Refrigeration

Retail-NC-v4 EAp4:Fundamental refrigerant management
posted by  Jason Smith  on 

I am currently working on a new retail construction project and would like to know if we should include the chilled drink cabinets (fizzy drinks, Milk etc.) within the Fundamental Refrigeration Cal

1
Thu Mar 3, 2016, 8:48 pm

0% credit achievement rate?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Graham Langton  on 

I'm seeing the credit achievement rate as 0% for this credit. Other achievement rates seem OK. Has nobody achieved this credit? Can this be verified?

1
Fri Oct 10, 2014, 2:23 pm

Rainwater Harvesting for Toilet Flushing

NC-v4 WEp2:Indoor water use reduction
posted by  Patrice McVeigh  on 

Hello all, Can rainwater harvesting be used to reduce the indoor water consumption percentage?

1
Thu Jun 2, 2016, 7:24 am

"Box" within an exisiting Warehouse

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Gina Dederer  on 

Our particular project consists of a 400sqm 1 floor "Box" (walls and roof) to be built in its entirety inside a much larger existing warehouse, which itself is part of a large industrial complex (b

3
Default Avatar
URS Deutschland GmbH
LEEDuser Basic Member
3 thumbs up
Tue Feb 7, 2017, 5:22 pm

>75% M&V Template Requirement

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Martin Meehan  on 

Dear all, Our project recently received the comment below which appears to require an Option B or D 'template' to be submitted with our plan if a tenant is to take 75% or more of the building spa

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 30, 2016, 4:34 pm

Lawn acceptance

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Patrice McVeigh  on 

Hi, We have received comments on the lawn areas of our project which states “lawn is acceptable only if it a) is not a monoculture, b) does not require regular maintenance or mowing, and c) does n

4
Tue Sep 27, 2016, 6:08 pm