Forum quick links
Sound transmission for moveable partitions
NC-v4 EQc9:Acoustic performanceposted by Anaïs P on
Do the requirements about sound transmission have to be applied for moveable partitions in open-plan office? Achieving the STC values from table 1 betweeen two standards offices separated by a move
Certify only one floor among three floors that are rented
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Diana Nezamutinova on
Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)? - A company XYZ has been renting 2 adjac
C&S or NC ?
posted by Claire PIMET on
I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project.
Finished wood
CI-v4 EQc2:Low-emitting materialsposted by Devani PERERA on
A finished wood floor has been varnished off-site previous to installation in a office project.
HOTEL Project Default Occupation
CS-2009 PIf3:Occupant and Usage Dataposted by Amanda Johnson on
Hello, Using the Annexe 1 C&S default occupation values, a hotel would have FTE plus Transient occupants.
Exterior lighting power
NC-v4 EAp2:Minimum energy performanceposted by Julien Richard on
Hello, We have a project where some luminaires have more power than what it is required by the mandatory provisions of exterior lighting power.
What if the Database of LCA tools is incomplete ?
NC-v4 MRc1:Building life-cycle impact reductionposted by Marius Dabonneville on
Hello, I’m Marius, I’m an intern in an environmental office in France. I’m working on Materials and that’s why I have a few questions about this credit and particularly Option 4.
Sea water exchanger heat pump, considere as renewable energy ?
NC-2009 EAc2:On-site renewable energyposted by Elodie DUMAS on
Hello We work on an office building connected to DES heating and colling (district level) and pursue Leed C&S v2009 certification.
Construction Waste Management-Multiple Buildings
NC-2009 MRc2:Construction waste managementposted by Ian McCall on
Dear LEED-ers, Scenario : One single project, consisting of an office building (LEED Ceritified) & hotel building (NOT LEED Certified) in a very built up area with limited space.
Erosion and Sedimentation Measures during demolition
NC-v4 SSp1:Construction activity pollution preventionposted by Anaïs P on
During demolition works, should the Erosion and Sedimentation measures be implemented? The Reference Guide only refers to construction works...