Entryway system

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Elodie DUMAS  on 

Our project is an office building where groundfloor is componed by retails and services dedicated to unknown tenants. Taking into account that this is a CS certification, do we need to install ent

4
Senior Sustainability Manager
WSP
LEEDuser Expert
53 thumbs up
Tue Aug 7, 2018, 1:48 pm

WaterSense Labelling Alternatives

CI-v4 WEp1:Indoor water use reduction
posted by  Oliver Bate  on 

Hi! Toilet (Water Closet); Urinals; Private Lavatory Facuet; and Showerheads all need to be WaterSense Labelled. However- what are the equivalent labels?

5
SW Regional Design Resilience Leader
Gensler
LEEDuser Basic Member
15 thumbs up
Fri Jul 20, 2018, 2:38 am

Bicyle Storage in a office building

CS-v4 LTc6:Bicycle facilities
posted by  Guillaume Rose  on 

Hi,

Is the Case 1. commercial or institutional projects applicable for an office building ? 

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Mon May 28, 2018, 9:27 am

Insulation - option 2 budget calculation method

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Dear all, The guide is not very clear about interior or exterior insulation when we use option 2. Exterior insulation must be included in option 2 calculation for New Construction of offices ?

6
Tue Apr 24, 2018, 10:44 pm

Parking spaces for projects logistics

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Anna Korinkova  on 

Our project is an exhibition center. Do we have to count parking spaces for exhibition logistics (incl. trucks, vans, supply deliveries ets.) into the LEV/FEV calculation? Thanks.

1
Mon Apr 9, 2018, 1:34 pm

90.1 2010: V4: Baseline Lighting Control

NC-v4 EAp2:Minimum energy performance
posted by  Adrien Dumolard  on 

Hello, I work on my first PRM. In the 9.4.1.2 mandatory provisions, the standart say: "The controlled lighting shall have at least one control step between 30% and 70% (inclusive) of full lighting

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Wed Apr 4, 2018, 1:31 pm

Staff resources for LEED ND Projects

ND-Plan-v4 MPR2:Must use reasonable LEED boundaries
posted by  Devani PERERA  on 

Hi,

Is it necessary to have a Leed Green Associate or a Leed AP ND to propose one project to the certification LEED ND (plan or built) ?

Thanks for your help.

Regards.

3
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Fri Oct 6, 2017, 9:06 am

EAP2 case 1 for international projects

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Elodie DUMAS  on 

I have a question about the following statement from above : "We have an international project and the space type is eligible for an Energy Star rating.

1
Tue Apr 28, 2015, 6:59 pm

EQ PC 57 - French feedback

CS-2009 IDc1:Innovation in Design
posted by  Elodie DUMAS  on 

Dear all, A short feedback about our experience concerning EQ PC 57 use, for an office tower project in France (Marseille) under LEED CS V3. For this project, LEED CS V3 and French "HQE" (High Env

0

satisfaction surveys - Ergonomics strategy

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Jean-Baptiste SARFATI  on 

Are there standardized satisfaction surveys for ergonomics workstations in a store ? We would like to evaluate METWAs, furnishings, and accessories to ensure they continue to meet the diversity of

0