Forum quick links
Entryway system
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Elodie DUMAS on
Our project is an office building where groundfloor is componed by retails and services dedicated to unknown tenants. Taking into account that this is a CS certification, do we need to install ent
WaterSense Labelling Alternatives
CI-v4 WEp1:Indoor water use reductionposted by Oliver Bate on
Hi! Toilet (Water Closet); Urinals; Private Lavatory Facuet; and Showerheads all need to be WaterSense Labelled. However- what are the equivalent labels?
Bicyle Storage in a office building
CS-v4 LTc6:Bicycle facilitiesposted by Guillaume Rose on
Hi,
Is the Case 1. commercial or institutional projects applicable for an office building ?
Insulation - option 2 budget calculation method
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, The guide is not very clear about interior or exterior insulation when we use option 2. Exterior insulation must be included in option 2 calculation for New Construction of offices ?
Parking spaces for projects logistics
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Anna Korinkova on
Our project is an exhibition center. Do we have to count parking spaces for exhibition logistics (incl. trucks, vans, supply deliveries ets.) into the LEV/FEV calculation? Thanks.
90.1 2010: V4: Baseline Lighting Control
NC-v4 EAp2:Minimum energy performanceposted by Adrien Dumolard on
Hello, I work on my first PRM. In the 9.4.1.2 mandatory provisions, the standart say: "The controlled lighting shall have at least one control step between 30% and 70% (inclusive) of full lighting
Staff resources for LEED ND Projects
ND-Plan-v4 MPR2:Must use reasonable LEED boundariesposted by Devani PERERA on
Hi,
Is it necessary to have a Leed Green Associate or a Leed AP ND to propose one project to the certification LEED ND (plan or built) ?
Thanks for your help.
Regards.
Development Density Calculations
CS-2009 SSc2:Development Density and Community Connectivityposted by Amanda Johnson on
For the Development Density calculations our project has an 880 ft DD radius .
LEED CS 2009 Update from october 2010
posted by Valentin Grimaud on
I am currently looking for a PDF version of LEED rating system CS 2009 updated from october 2010. Current version on USGBC website is updated from 2013, but the project I'm currently working on wa
Fertilizer and Herbicide Use
EBOM-v4 SSp1:Site management policyposted by David ESPAGNET on
In the site Management Policy (and SSc5 Credit) soil testing requirement have been added since 2009.