Forum quick links
Energy Modeling for Support buildings
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- Recently we submit the factory building to LEED as Individual project certification not for group certification.
Probability distribution of annual PV production.
NC-2009 EAc2:On-Site Renewable Energyposted by Indochine Engineering VN on
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.
Water Fountains in an Urban Setting
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Doug Snyder on
We have a tower project in SE Asia that will have several decorative water fountains.
Is it too late to do SSp1?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Indochine Engineering VN on
Hi, My project is a hotel and client just decided to do LEED when Construction of structure is almost done.
LE and FE Motorbike Parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Tim Middleton on
Our project is mixed use (retail, residential, hotel) and has parking for 894 cars and 3089 "2 wheeled vehicles" which will be a mix of bicycles, electric bikes and motorbikes but mostly motorbikes
Glare control device simulation - Option 2
NC-v4 EQc7:Daylightposted by Hanh Truong on
Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).
loading bay inside building footprint
NC-2009 PIf2:Project Summary Detailsposted by Melissa Merryweather on
Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.
Painting/coating in tenant space
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Indochine Engineering VN on
Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease.
Lighting control for Meeting room
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Thanh Le on
If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit.
Location of OA monitor at PAU or AHUs
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Indochine Engineering VN on
Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every AHU? Thank you for your advic